HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
13 units
Mix
6 × 1BHK · 6 × 2BHK · 1 × Office space
Booked
5 of 13 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
607 sq m
Floor area
1,413 sq m
Description
Ishna residence

Timeline

Project startedMar 2022
RERA registeredNov 2025
Proposed completionApr 2026
TodayJul 2026
Construction progress

86% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

8 of 13 available
TypeArea sq mAvailable
1BHK553 of 3
1BHK603 of 3
2BHK670 of 3
2BHK751 of 3
Office space841 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

Anil Kuyilath

Thrissur, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2025–2026Active
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Amalanagar, Thrissur
Village
PUZHAKKAL
Taluk
Thrissur
District
Thrissur
Pincode
680555
Survey no.
Re Sy 4/19/1
Patta no.
3077
What’s nearby
Schools1 school within 500m · 8 educational institutions within 1km · College or university 1.4km away
HealthcareHospital 697m away · 1 clinic within 1km · Pharmacy within 500m
LifestylePark 666m away · Gym or sports centre 362m away · 4 restaurants and cafes within 1km
ShoppingSupermarket 795m away · Bank 312m away · ATM within 500m
Getting around
Primary road 3 m · Thrissur-Kuttipuram roadRailway line 1.1 km · Guruvayur-Thrissur LineRailway station 512m away (Amalanagar)Bus stop within 500m
Water & environment
Water body 347 m · Ramanchira Temple Pond
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Adat Grama Panchayat

Grama Panchayat
approved 3 Feb 2022 · 4 yrs ago
Building Permit no. BA(40800)/2022Survey no. Re Sy 4/19/1

The promised possession date (8 Apr 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan BA(40800)/2022 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Adat Grama Panchayat

Grama panchayat

Has approved 6 RERA projects0.4% of Kerala.

a mixed market50% apartments · 50% plotted layouts.

Builders
6
On record
43 flats · 38 plots
Since
2021

More layout-heavy than Kerala overall — 50% plots here vs 19% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.