1. As per Township Policy 2010, Plot No. 29,30,38,39,40,41 total 6 plots admeasuring 511.71 Sq Meter have been kept as mortgaged with JDA and these Plots would be allotted after completion of internal development work and deposition of development charges with JDA
2. 2. As per JDA approved plans, Commercial Plot C-1 (93.00 Square Meter) is JDA Plot and this plot will be sold by JDA only, not by the promoter.
3. Open Area Includes Park 340 Sq Mtrs, SWM 58 Sq Mtrs, MT 10 Sq Mtrs, UT 10 Sq Mtrs and Road 2660.87 Sq Mtrs toatalling 3078.87 Sq Mtrs
4. Saleable Area includes 41 residential plots of 3788.49 Sq Mtrs, Informal Commercial 135.96 Sq Mtrs and Khatedar Commercial C-2 100.68 Sq Mtrs totalling 4025.13 Sq Mtrs
Timeline
Construction startMay 2024
RERA registeredMay 2024
Proposed completionSep 2025
TodaySep 2026
Find your plot
Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
44 plots across 18 batches
TypeArea sq mCount
Plot8417
Plot938
Plot931
Plot1212
Plot1052
Plot931
Plot801
Plot831
Plot1292
Plot1111
Plot1361
Plot841
Plot811
Plot841
Plot851
Plot1121
Plot1011
Plot1001
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 154 mNo metro or railway within 5km2 bus stops within 500m
Price analysisdeclared build cost — not a sale price
₹10.49 Cr declared to build 44 plots. What that works out to:
₹23.85 Lakhdeclared cost per plotall-in — land + construction
₹1,354/sq ftof plotted area₹14,579/sq m
81%of the cost is land₹1,096/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates
In Rajasthan it’s called the DLC rate.
₹14,883per sq yd
₹17,800per sq m
Which rate
residential, interior plot
Matched to
The rate published for the village of “BHANKROTA KALAN”.
Highest rate
₹29,298 per sq yd — the top road-facing rate among the 4 residential rates published for this village
By the road it faces
interior plot
₹17,800 / sq m
₹14,883 / sq yd
road-facing
₹29,200 / sq m
₹24,415 / sq yd
41–60 ft road
₹32,120 / sq m
₹26,856 / sq yd
61–99 ft road
₹33,580 / sq m
₹28,077 / sq yd
100 ft+ road
₹35,040 / sq m
₹29,298 / sq yd
The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.
This filing declares ₹14,579 per sq m of plotted area — 0.82× the government figure. Declared cost is land and construction; the government guidance rate is what the state will not register a sale below. Neither is a sale price.
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Jaipur Development Authority
Development Authority
Layout Permitapproved 31 May 2024 · 2 yrs ago
The promised possession date (30 Sep 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Jaipur Development Authority
Development authority
Has approved 644 RERA projects — about 1 in 3 in Rajasthan, more than any other body in the state.
a mixed market — 52% apartments · 48% plotted layouts.
Builders
528
On record
15,937 flats · 30,970 plots
Reach
2 districts
Since
2017
More apartment-heavy than Rajasthan overall — 52% apartments here vs 34% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.