KAMLA MANGAL - B

PR/GJ/KHEDA/NADIAD/Others/PAA10757/101022 · GujRERA · https://gethorizon.in/projects/kamla-mangal-b-nadiad-6560xxft

01

Complete project overview

GujRERA · Registration filing
Plots
7 plots
Mix
7 × Residential
Carpet area
112–137 sq mper-unit range, as filed
Land area
1,084 sq m

Timeline

Project startedAug 2022
RERA registeredOct 2022
Proposed completionDec 2025
TodaySep 2026
Construction progress

0% overall, as filed

Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

7 units across 1 batch
TypeArea sq mCount
Residential1557

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

GujRERA · Builder registration

NAVINCHANDRA MANGALBHAI PATEL AND OTHERS

OtherPromoter type
Kheda, GujaratBased in
2Projects
1City
2022–2025Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
69 plotson the public record across 2 projects
13,654 sq mplotted area
13,654 sq mland declared
₹2.19 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from NAVINCHANDRA MANGALBHAI PATEL AND OTHERS— the full portfolio →

03

Location & price analysis

GujRERA · Registration filing
Taluka
Nadiad
District
Kheda
Address
NADIAD (RATANJI PARTY)TA: NADIAD
What’s nearby
SchoolsNearest school 1.7km away · College or university 1.5km away
HealthcareHospital 947m away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingSupermarket 1.7km away · Mall 1.6km away
Getting around
Expressway 886 mPrimary road 411 mRailway line 727 mRailway station 2.4km away (Nadiad Junction)Limited bus connectivity nearby
Water & environment
Canal 294 mWater body 385 m
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹18.22 Lakh declared to build 7 plots. What that works out to:

₹8.60 Lakh – ₹10.13 Lakhdeclared unit pricerange on the filing — not a live asking price
₹2.60 Lakhdeclared cost per plotall-in — land + construction
₹156/sq ftof plotted area₹1,681/sq m
44%of the cost is land₹68/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Gujarat Revenue Department — Annual Statement of Rates (jantri), 2011

In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.

₹10,034per sq yd
₹12,000per sq m
Which rate
land + construction: residential flat
Matched to
The rate published for the village of “NADIAD”.
In force
2011 schedule

What this number is — and isn’t

  • The minimum value Gujarat’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

GujRERA · Approved building plan

Others

Layout Permitapproved 10 Oct 2022 · 3 yrs ago

The promised possession date (31 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

Building-Use (BU) permission — the occupancy sign-off, on record

All 1 block carry a Building-Use (BU) permission (latest 25 Jul 2023)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.

The approving body, at scale

The approving authority

The body that approved this project. It has approved 2,653 RERA projects across 26 talukas about 1 in 6 in Gujarat.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

13 plotted projects still under way within 25 km. Step out ring by ring:

Of the 54 projects the radar draws within 6 km — every kind, every stage — 2 are plotted projects still under way. This list keeps only those, and looks further out.

2 projects within 10 km — showing the nearest 2.

850 m awayPlotted Development

RAMDHAM

NARESHBHAI JIVANBHAI PATEL AND OTHERS · Kheda

May 2023registered
Mar 2026target completion
Declared cost₹5.54 CrScale54 plotsAuthorityGujRERA
4.0 km awayPlotted Development

FK ELEGANCE Phase-2

ELEGANCE DEVELOPERS · Nadiad

Nov 2024registered
Apr 2027target completion
Price band₹3.02 Lakh–₹11.30 LakhScale185 plotsAuthorityGujRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.