Yes — registered under affordable housingprice caps & eligibility apply
Timeline
Project startedJan 2015
RERA registeredSep 2017
Proposed completionDec 2017
TodaySep 2026
Construction progress
100% overall, as filed
Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
224 units across 1 batch
TypeArea sq mCount
Residential65224
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
2,371 homeson the public record across 10 projects
2,01,574 sq mbuilt-up filed
39,607 sq mland declared
₹320.07 Crdeclared build cost
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Ahmedabad Municipal CorporationMunicipal / Corporationthis project9 of 10 projects
Ahmedabad Urban Development AuthorityUrban Development Authority1 of 10 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 153 m · Sardar Patel Ring Road FlyoverPrimary road 3.6 kmRailway line 998 mRailway station 1.5km away (Ambli Road)Limited bus connectivity nearby
Water & environment
Water body 561 m · Shilaj Lake
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹81.00 Cr declared to build 224 flats. What that works out to:
₹29.00 Lakh – ₹49.95 Lakhdeclared unit pricerange on the filing — not a live asking price
₹36.16 Lakhdeclared cost per flatall-in — land + construction
48%of the cost is land₹5,330/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Gujarat Revenue Department — Annual Statement of Rates (jantri), 2011
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
₹6,062per sq yd
₹7,250per sq m
Which rate
land + construction: residential flat
Matched to
The rate published for “SHILAJ”.
In force
2011 schedule
Spread
₹4,808 – ₹7,525 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Gujarat’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
GujRERA · Approved building plan
Ahmedabad Municipal Corporation
Municipal / Corporation
Building Permitapproved 1 Sep 2017 · 9 yrs ago
The promised possession date (31 Dec 2017) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
Building-Use (BU) permission — the occupancy sign-off, on record
1 of 4 blocks carry a Building-Use (BU) permission (latest 5 Sep 2017)— Gujarat’s legal-to-occupy sign-off. The remaining blocks are not shown as BU-cleared here; treat those as not-yet-occupiable until confirmed.
The approving body, at scale
Ahmedabad Municipal Corporation
Municipal Corporation
Has approved 3,250 RERA projects — about 1 in 5 in Gujarat, more than any other body in the state.
an apartments market — 99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.
Builders
2,712
On record
4,25,177 flats · 633 plots
Reach
6 talukas
Since
2007
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to GujRERA
Litigation
None declared in this filing
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
2,613 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,036 projects the radar draws within 6 km — every kind, every stage — 395 are residential projects still under way. This list keeps only those, and looks further out.