HPRERASHI2025169/P · HP RERA · https://gethorizon.in/projects/krishna-plot-shimla-urban-x630bp4j
01
Complete project overview
HP RERA · Registration filing
Project name
KRISHNA PLOT
Inventory
3 plots filed
Declared completion period
3 years 0 monthsduration from approval, as filed — no start date is on record
Registration valid until
3 Nov 2028
Description
Plots
Not provided by the promoter
Septic Tank and Soak Pitsite infrastructure the promoter declared is another party's responsibility — confirm who delivers it
Find your plot
Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
3 plots across 3 batches
TypeArea sq mCount
Residential Plot1591
Residential Plot1511
Residential Plot1531
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Location — done
04
Government Guidance Rate
Himachal Pradesh registration department
In Himachal Pradesh it’s called the circle rate.
No government guidance rate is shown for this project.
Himachal Pradesh's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
HP RERA · Approved building plan
Urban Town Planning/NAC/Municipal Corporation or Council
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan 94(AP) DATED 21/03/2024 on the approving authority’s portal to confirm the approval.
Not published. HP RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to HP RERA
Litigation
None declared in this filing
Only what the builder declared, or what HP RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with HP RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
41 plotted projects still under way within 25 km. Step out ring by ring:
Of the 39 projects the radar draws within 6 km — every kind, every stage — 22 are plotted projects still under way. This list keeps only those, and looks further out.
3 projects within 1 km — showing the nearest 3.
500 m awayPlotted (Residential)
HILL GROVE COLONY
GEETA RAM · Shimla
Scale5 plotsRegistrationvalid to Mar 2028AuthorityHP RERA