HORIZON
Share

KUBER RESIDENCY

P-JBP-17-767 · RERA Madhya Pradesh · https://gethorizon.in/projects/kuber-residency-jabalpur-9hv3w6ue

01

Complete project overview

RERA Madhya Pradesh · Registration filing
Project name
KUBER RESIDENCY
Units
62 flats
Unit mix
62 × 2BHK
Quarterly reports
7 on file · latest Oct 2017 - Dec 2017quarterly progress certificates filed with RERA

Timeline

Project startedJan 2014
RERA registeredOct 2017
Proposed completionJun 2018
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

62 units across 1 batch
TypeArea sq mCount
2BHK62

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Madhya Pradesh · Builder registration

BADERIA DEVELOPER AND KUBER DEVELOPER

Partnership Firm / LLPPromoter type
1Projects
1City
2017–2018Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Madhya Pradesh · Registration filing
District
Jabalpur
Tehsil
Jabalpur
Planning area
Jabalpur
Address
Kuber residency, gopal vihar colony gopal bagh near domah naka jabalpur
What’s nearby
SchoolsNearest school 1.9km away · College or university 1.6km away
HealthcareHospital 300m away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km · Bank 645m away
Getting around
Expressway 1.8 kmPrimary road 290 mRailway line 2.6 kmRailway station 2.6km away (Madan Mahal)Limited bus connectivity nearby
Water & environment
Water body 898 mRiver 1.7 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹6.01 Cr declared to build 62 flats. What that works out to:

₹9.70 Lakhdeclared cost per flatall-in — land + construction
16%of the cost is land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

MP Department of Registration & Stamps

In Madhya Pradesh it’s called the collector guideline rate.

₹25,084per sq yd
₹30,000per sq m
Which rate
multi-storey residential
Matched to
The rate published for “WARD KI ANYA COLONY EVAM SHESH KSHETRA”, 20 m from this project.
In force
2026-2027 schedule · effective Apr 2026

Colonies around this project

GOPAL BAG, GOPAL SADAN₹45,000 / sq m₹37,626 / sq yd180 m
HARDOUL MANDIR SE DAMOHNAKA CHOWK WARD KI SEEMA TAK₹55,000 / sq m₹45,987 / sq yd240 m
HARDOUL MANDIR HOKER DIXITPURA MAIN ROAD₹60,000 / sq m₹50,168 / sq yd250 m
DIXITPURA ROAD₹55,000 / sq m₹45,987 / sq yd290 m
GOPALDAS MARG - DAMOH NAKA SE CHHOTA FUHARA TAK₹47,000 / sq m₹39,298 / sq yd320 m

The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.

What this number is — and isn’t

  • The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of colony, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Madhya Pradesh · Approved building plan

Jabalpur

Town & Country Planning (DTCP)
Building Permitapproved 3 Oct 2017 · 8 yrs ago

The promised possession date (30 Jun 2018) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Jabalpur

Town & Country Planning area · Jabalpur district

Has approved 268 RERA projectsabout 1 in 20 in Madhya Pradesh.

a mixed market44% apartments · 56% plotted layouts.

Builders
203
On record
17,810 flats · 18,089 plots
Reach
8 tehsils
Since
2017

More apartment-heavy than Madhya Pradesh overall — 44% apartments here vs 28% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by RERA Madhya Pradesh

07

Other projects nearby

The register · within 25 km

9 residential projects still under way within 25 km. Step out ring by ring:

Of the 137 projects the radar draws within 6 km — every kind, every stage — 6 are residential projects still under way. This list keeps only those, and looks further out.

1 project between 1 and 3 km — showing the nearest 1.

1.5 km awayApartment

ARIHANT HEIGHTS

RELIABLE INFRA · Jabalpur

Jun 2024registered
Sep 2026target completion
Declared cost₹15.88 CrScale12 flatsAuthorityRERA Madhya Pradesh

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Complaints — RERA Madhya Pradesh does not publish a complaints register. This read cannot speak to them either way.