ADVIKA PARADISE
MAHAKAUSHAL INFRA PVT. LTD. · Jabalpur · Gorakhpur
SHRADHA SABURI
Timeline
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
₹3.75 Cr declared to build 16 flats. What that works out to:
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
In Madhya Pradesh it’s called the collector guideline rate.
Colonies around this project
| GANESH RESIDENCY RAMPUR | ₹35,000 / sq m | ₹29,264 / sq yd | 330 m |
|---|---|---|---|
| KASHI KUNJ - BOSE COLONY | ₹30,000 / sq m | ₹25,084 / sq yd | 380 m |
| RAMPUR CHOWK SE AAGE SAI MANDIR SE BADSHAH HALWAI MANDIR HOTE HUYE SAM MALL ROAD TAK | ₹60,000 / sq m | ₹50,168 / sq yd | 390 m |
| IDEAL HOUSING SOCIETY ROAD SE ANDAR | ₹30,400 / sq m | ₹25,418 / sq yd | 460 m |
| RAMPUR CHOWK CHHODKAR MOD SE AZAD CHOWK TAK | ₹40,000 / sq m | ₹33,445 / sq yd | 460 m |
The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.
What this number is — and isn’t
The promised possession date (24 Jul 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Has approved 268 RERA projects — about 1 in 20 in Madhya Pradesh.
a mixed market — 44% apartments · 56% plotted layouts.
More apartment-heavy than Madhya Pradesh overall — 44% apartments here vs 28% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RERA Madhya Pradesh doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
Only what the builder declared, or what RERA Madhya Pradesh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Madhya Pradesh, or that this register doesn’t publish it — never that nothing happened.
9 residential projects still under way within 25 km. Step out ring by ring:
Of the 129 projects the radar draws within 6 km — every kind, every stage — 6 are residential projects still under way. This list keeps only those, and looks further out.
2 projects within 3 km — showing the nearest 2.
MAHAKAUSHAL INFRA PVT. LTD. · Jabalpur · Gorakhpur
SHIVA BUILDCON · Jabalpur
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.
What this record cannot tell you