HORIZONMarkets
Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
106 units
Mix
30 × Flat Type 3 · 28 × Flat Type 2 · 15 × Shop · 13 × Type3 · 7 × Type2 · 7 × Type1 · 3 × Office · 1 × Ofice Type 1 · 1 × Flat Type 1 · 1 × Sho5
Carpet area
9–71 sq mper-unit range, as filed
Floors
18
Buildings
2
Parking
27 spaces
Land area
2,440 sq m
Sanctioned built-up
2,406 sq m
Recreational open space
238 sq m

Timeline

RERA registeredAug 2017
Proposed completionMay 2023
TodayJul 2026

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

106 units across 19 batches
TypeArea sq mCount
Shop126
Office321
Office192
Ofice Type 1341
Flat Type 1711
Flat Type 34830
Shop152
Flat Type 23528
Shop111
Shop101
Sho591
Shop101
Shop111
Shop141
Shop171
Type33113
Type2317
Type1287
Shop111

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Promoter registration

LAABH BUILDWELL

PartnershipPromoter type
Thane, MAHARASHTRABased in
1Projects
1City
2017–2023Active
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Thane (M Corp.)
Taluka
Thane
District
Thane
Pincode
400615
Survey no.
SN6/2W SN6/3C SN6/4
North boundary
SN 107
East boundary
SN 106
South boundary
20 M WIDE DP ROAD
West boundary
40 M WIDE DP ROAD
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 505m away · 1 clinic within 1km · Doctor's clinic within 1km
LifestylePark 1.4km away
ShoppingSupermarket 776m away
Getting around
Expressway 2.0 kmPrimary road 684 m · Thane Ghodbunder RoadRailway line 3.2 kmMetro station 1.6km away (Gowniwada Station)Bus stop within 500m
Water & environment
Canal 56 mWater body 184 m · Kasarvadavli Lake
distances only — not a flood assessment
04

Planning authority

MahaRERA · Approved building plan

Laabh Buildwell

Building Permit
Survey no. SN6/2W SN6/3C SN6/4

The promised possession date (30 May 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

The approving body, at scale

The planning authority

The body that sanctioned this project. It has approved 4,607 RERA projects across 33 districts about 1 in 4 in Maharashtra.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

Legal & regulatory record
LitigationNone declared to MahaRERA
Compliance1 non-compliance notice on record
Appeals1 appeal before the tribunal
From MahaRERA's record — the litigation flag is the promoter's declaration; complaints, appeals and non-compliance notices are the authority's own filings. A flagged line is worth checking with the authority; none of it is a verdict on the project.
Complaints register

3 complaints on MahaRERA’s register for this project 2 disposed, 1 still open.

A count from the authority’s public register — not a judgement. A disposed complaint may have been resolved for or against the builder, and only disputes escalated this far appear at all.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.