HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
44 units
Mix
22 × 2BHK · 22 × 3BHK
Buildings
1
Land area
2,209 sq m
Floor area
6,139 sq m
Description
Land Links Pearl

Timeline

Project startedJan 2023
RERA registeredJan 2025
Proposed completionDec 2027
TodayJul 2026
Construction progress

6% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation7%
Basement(s) and Plinth7%
Stilt Floor7%
Slabs of Super Structure7%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings7%
Sanitary Fittings7%
Electrical Fittings7%
Staircases, Lifts Wells7%
Overhead and Underground Water Tanks.7%
The external plumbing and external plastering7%
Completion of terraces floor each building7%
Installation of lifts, water pumps etc7%
Fire Fighting Fittings and Equipment7%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc7%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

44 of 44 available
TypeArea sq mAvailable
2BHK9011 of 11
2BHK9211 of 11
3BHK13022 of 22

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

Sethumadhavan K S

Palakkad, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2025–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Kalmandapam
Village
MARUTHUROAD
Taluk
Palakkad
District
Palakkad
Pincode
678013
Survey no.
74/3, 74/3
Patta no.
11082
What’s nearby
SchoolsNearest school 1.2km away · College or university 1.2km away · Library 444m away
HealthcareHospital 881m away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingSupermarket 1.0km away · Mall 1.7km away · Convenience store within 1km
Getting around
Expressway 1.4 km · Salem - Kochi - Kanyakumari HighwayPrimary road 865 m · Palakkad - Pollachi RoadRailway line 4.0 km · Pollachi - PalakkadNo metro or railway within 5kmBus stop within 1km
Water & environment
Water body 120 m · Variyathu KulamCanal 878 m
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Marutharoad Panchayath

Local body (LSGI)
approved 7 Mar 2012 · 14 yrs ago
Building Permit no. A2-4480/12Survey no. 74/3, 74/3
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan A2-4480/12 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

The local self-government (LSGI)

The local body that sanctioned this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.