Complete project overview

K-RERA · Registration filing
Units
68 units
Mix
30 × 1BHK · 22 × 2BHK · 15 × 3BHK · 1 × Office space
Booked
12 of 68 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
1,891 sq m
Floor area
7,594 sq m
Description
LANDCHESTER ASTORIA

Timeline

Project startedDec 2022
RERA registeredMay 2023
Proposed completionDec 2027
TodayJul 2026
Construction progress

2% overall, as filed

Basement(s) and Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings0%
Sanitary Fittings0%
Electrical Fittings0%
Staircases, Lifts Wells0%
Overhead and Underground Water Tanks.0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation30%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

56 of 68 available
TypeArea sq mAvailable
1BHK286 of 8
3BHK775 of 7
1BHK323 of 7
2BHK636 of 7
3BHK728 of 8
1BHK366 of 7
2BHK475 of 7
2BHK618 of 8
Office space3721 of 1
1BHK348 of 8

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

Landchester Builders India Private Ltd

CompanyPromoter type
Thrissur, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
3Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
192 homeson the public record across 3 projects
19,836 sq mbuilt-up filed
5,149 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Avanur Grama Panchayat ThrissurLocal body (LSGI)2 of 3 projects
Mulakunnathukavu Grama PanchayatGrama Panchayatthis project1 of 3 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
NEAR KOZHIKKUNU HEALTH CENTRE
Village
KILLANNUR
Taluk
Thrissur
District
Thrissur
Pincode
680581
Survey no.
877/1-7, 898/8-1
Patta no.
13414
What’s nearby
SchoolsNearest school 1.7km away · Library 578m away
HealthcareNearest hospital 2.1km away
Lifestyle1 park within 500m · 4 restaurants and cafes within 1km
ShoppingSupermarket 679m away · Mall 182m away · Convenience store within 1km
Getting around
Primary road 193 m · Kodungallur-Shornur RoadRailway line 852 mRailway station 846m away (Mulagunnathukavu)Bus stop within 1km
Water & environment
Water body 244 m · Manissery Konjeri KulamCanal 428 m · Peechi RBMC (Thanikkudam Distributory)
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Mulakunnathukavu Grama Panchayat

Grama Panchayat
approved 27 Dec 2022 · 3 yrs ago
Building Permit no. A2-BA(409942)/2022Survey no. 877/1-7, 898/8-1
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan A2-BA(409942)/2022 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Grama Panchayat

A village-level local self-government (LSGI) that issues the permit — Kerala's most common approving body. It has approved 268 RERA projects across 13 districts about 1 in 6 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.