Maa Vaishnavi Nagari 9- Wing III
Niklesh Deshmukh, Sangita Rithe, Priyanka Deshmukh, Vandana Deshmukh(Part. Maa Vaishnavi Buil.&Dev.) · Pipri · Wardha
Maa Vaishnavi Nagari 9 Wing 2
This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
Timeline
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.






A building already stood within ~27 m of the recorded location in 2016 (about 10 m), 10 m in 2023.
Satellite view, year by year
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~27 m of the filed location.
Satellite photographs of the same ground
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
The promised possession date (31 Mar 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Has approved 6 RERA projects — 0% of Maharashtra.
an apartments market — 83% apartments · 17% plotted layouts. Apartments like yours are this body's core business.
More layout-heavy than Maharashtra overall — 17% plots here vs 5% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
16 residential projects still under way within 25 km. Step out ring by ring:
Of the 122 projects the radar draws within 6 km — every kind, every stage — 15 are residential projects still under way. This list keeps only those, and looks further out.
1 project within 1 km — showing the nearest 1.
Niklesh Deshmukh, Sangita Rithe, Priyanka Deshmukh, Vandana Deshmukh(Part. Maa Vaishnavi Buil.&Dev.) · Pipri · Wardha
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.
What this record cannot tell you
Where each section of this report comes from.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/maa-vaishnavi-nagari-9-wing-2-pipri-ct-wardha-puq4jjst.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.