68 × Villa on LIG Plot No. L-01 to 17, L-19 to 69 · 17 × Villa on EWS Plot No. E-01 to E-03, E-05 to E-18 · 10 × E-1 To E-10 (First Floor Flats)Villa · 1 × Commercial Plot (580.511 sq mtr) · 1 × Informal Commercial Plot No. 1 (135.133 sq mtr) · 1 × Villa on EWS Plot No. E-04
Carpet area
29–98 sq mper-type range, as filed
Land area
12,723 sq m
Description
Earlier, 12.5% of the total saleable plots has been mortgaged by the Bhiwadi Integrated Development Authority, BIDA against the internal development work of the project those plots are plot no. E-04 (44.95 sq.mtr.), plot no. L-18 (74.97 sq.mtr.) and Commercial Plot (715.64 sq.mtr.)
As per new revised maps, 12.5% of the total saleable plots has been mortgaged by the Bhiwadi Integrated Development Authority, BIDA against the internal development work of the project those plots are plot no. E-11 ( 44.94 sq.mtr.), plot no. L-18 (74.97 sq.mtr.) and Commercial Plot (835.02 sq.mtr.)
Now, 12.5% of the total saleable plots has been mortgaged by the Bhiwadi Integrated Development Authority, BIDA against the internal development work of the project those plots are plot no. E-11 ( 44.94 sq.mtr.), plot no. L-18 (74.97 sq.mtr.) and Commercial Plot (835.02 sq.mtr.).
Timeline
Construction startFeb 2022
RERA registeredMar 2022
Proposed completionFeb 2026
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
102 units across 10 batches
BuildingTypeArea sq mCount
MADHUVAN RESIDENCYVilla on LIG Plot No. L-01 to 17, L-19 to 699868
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
HealthcareNo hospital within 5km · 1 clinic within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Primary road 990 mNo metro or railway within 5kmLimited bus connectivity nearby
Price analysisdeclared build cost — not a sale price
₹16.60 Cr declared to build 102 flats. What that works out to:
₹16.27 Lakhdeclared cost per flatall-in — land + construction
₹1,360/sq ftof built-up area₹14,640/sq m
10%of the cost is land₹117/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates
In Rajasthan it’s called the DLC rate.
₹3,345per sq yd
₹4,000per sq m
Which rate
residential, interior plot
Matched to
The rate published for “MILAKPUR VILLAGE”.
Highest rate
₹4,515 per sq yd — the top road-facing rate among the residential rates published for this colony
By the road it faces
interior plot
₹4,000 / sq m
₹3,345 / sq yd
road-facing
₹4,500 / sq m
₹3,763 / sq yd
41–60 ft road
₹4,950 / sq m
₹4,139 / sq yd
61–99 ft road
₹5,180 / sq m
₹4,331 / sq yd
100 ft+ road
₹5,400 / sq m
₹4,515 / sq yd
The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this colony.
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of colony, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 7 Mar 2022 · 4 yrs ago
The promised possession date (13 Feb 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
6 residential projects still under way within 25 km. Step out ring by ring: