MAHESHWAR

P52800032774 · MahaRERA · https://gethorizon.in/projects/maheshwar-nachane-ct-ratnagiri-84d0irct

01

Complete project overview

MahaRERA · Registration filing
Project name
MAHESHWAR
Units
24 units
Floors
3
Buildings
12
Land area
2,500 sq m
Sanctioned built-up
1,600 sq m

Timeline

RERA registeredJan 2022
Proposed completionDec 2030
TodaySep 2026
Construction progress
Water conservation…10%
Electrical meter r…20%
Sewerage (Chamber,…85%
Water Supply90%
Excavation100%
Basement (if any)100%
Podiums100%
Plinth100%
Stilt floor100%
Superstructure100%
Internal finishes100%
Flat fit-out100%
Stairs & lifts100%
External finishes100%
OC-readiness100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

Suhas Tukaram Chavan

IndividualPromoter type
Ratnagiri, MAHARASHTRABased in
1Projects
1City
2022–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
≈ area only · geocoded, verified but not exact · 16.9851, 73.3424 · © OpenStreetMap contributors
Village
Nachane (CT)
Taluka
Ratnagiri
District
Ratnagiri
Pincode
415639
Survey no.
S.No. 423A1A/17 H.No. 1,2,3,4,5,6
North boundary
Property of Mr Shashikant S Sawant
East boundary
Property of smt Anuradha K Dheer
South boundary
Internal Road of 15 feet
West boundary
S No 423A1A 17 Sub Div No 2
What’s nearby
SchoolsNearest school 1.3km away · College or university 1.8km away
HealthcareHospital 274m away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km · Mall 1.3km away · Bank 956m away
Getting around
Expressway 1.2 km · Hathkambe Ratnagiri Road; Mumbai Ratnagiri HighwayPrimary road 284 mRailway line 808 mRailway station 2.6km away (Ratnagiri)Limited bus connectivity nearby
Water & environment
River 1.1 km · Kajvi
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Sdo Ratnagiri Subdivision

Building Permit
Survey no. S.No. 423A1A/17 H.No. 1,2,3,4,5,6
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Sdo Ratnagiri Subdivision

Planning authority

Has approved 11 RERA projects0.1% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
10
On record
11 flats · 0 plots
Since
2022

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

87 residential projects still under way within 25 km. Step out ring by ring:

6 projects within 1 km — showing the nearest 6.

NachaneResidential / Group Housing

SKY TOWER PHASE-I

K N DEVELOPERS AND ENGINEERS LLP

Feb 2026registered
Jun 2028target completion
Scale31 flatsAuthorityMahaRERA
NachaneResidential / Group Housing

Ram Janaki Plaza

Rajendra Vitthal More

Jan 2018registered
Jan 2029target completion
Scale5 flatsAuthorityMahaRERA
NachaneResidential / Group Housing

RAJASVI ENCLAVE

VIVEK PRABHAKAR BAPAT

May 2024registered
May 2029target completion
Scale26 flatsAuthorityMahaRERA
NachaneResidential / Group Housing

AARAMBH HOMES

YASHRAJ ENTERPRISES

Nov 2021registered
Dec 2026target completion
Scale106 flatsAuthorityMahaRERA
NachaneResidential / Group Housing

ANIKET HEIGHTS

SWAKARM BUILDERS AND DEVELOPERS

Jan 2025registered
Dec 2027target completion
Scale36 flatsAuthorityMahaRERA
NachaneResidential / Group Housing

Neermiti Residency

Imran Mujahid Mulla

May 2024registered
Dec 2030target completion
Scale96 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the general area only, not the exact site.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  5. 05Planning authority
    • MahaRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  6. 06Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/maheshwar-nachane-ct-ratnagiri-84d0irct.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.