Complete project overview

K-RERA · Registration filing
Units
17 units
Mix
12 × 1BHK · 4 × 2BHK · 1 × Shops and Showrooms
Booked
14 of 17 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
566 sq m
Floor area
1,367 sq m
Description
MARITIME PRIME

Timeline

RERA registeredSep 2024
Project startedNov 2024
Proposed completionNov 2026
TodayJul 2026
Construction progress

6% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation7%
Basement(s) and Plinth7%
Stilt Floor7%
Slabs of Super Structure7%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings7%
Sanitary Fittings7%
Electrical Fittings7%
Staircases, Lifts Wells7%
Overhead and Underground Water Tanks.7%
The external plumbing and external plastering7%
Completion of terraces floor each building7%
Installation of lifts, water pumps etc7%
Fire Fighting Fittings and Equipment7%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc9%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

3 of 17 available
TypeArea sq mAvailable
1BHK491 of 4
Shops and Showrooms831 of 1
1BHK411 of 4
2BHK730 of 4
1BHK510 of 4

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

MARITIME BUILDERS PRIVATE LIMITED

CompanyPromoter type
Ernakulam, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
1Projects
1Cities
2024–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
AM THOMAS ROAD
Village
ERNAKULAM
Taluk
Kanayannur
District
Ernakulam
Pincode
682016
Survey no.
855/2
Patta no.
23642
What’s nearby
Schools2 schools within 500m · 7 educational institutions within 1km · College or university 544m away
HealthcareHospital 173m away · 15 clinics within 1km · Pharmacy within 500m
LifestylePark 2.0km away · Gym or sports centre 344m away · 130+ restaurants and cafes within 1km
ShoppingSupermarket 243m away · Mall 1.8km away · Convenience store within 500m
Getting around
Expressway 2.3 km · Indira Gandhi RoadPrimary road 107 m · Mahatma Gandhi RoadRailway line 462 mMetro station 388m away (Ernakulam South)11 bus stops within 500mAirport 2.6km away
Water & environment
Water body 598 m
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Kochi Municipal Corporation Ernakulam

Local body (LSGI)
approved 22 Aug 2024 · 1 yr ago
Building Permit no. BP/8426/2024Survey no. 855/2
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan BP/8426/2024 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

The local self-government (LSGI)

The local body that sanctioned this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.