HORIZON
Share

NARAYAN ENCLAVE

BRERAP53625-1/901/R-988/2020 · RERA Bihar · https://gethorizon.in/projects/narayan-enclave-digha-patna-ak0laws1

01

Complete project overview

RERA Bihar · Registration filing
Project name
NARAYAN ENCLAVE
Units
12 units
Unit mix
8 × 3 BHK · 4 × 2 BHK
Parking
12 spaces
Land area
456 sq m
Built-up area
864 sq m

Timeline

Project startedApr 2019
RERA registeredJun 2020
Proposed completionOct 2022
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

12 units across 2 batches
BuildingTypeArea sq mCount
NARAYAN ENCLAVE3 BHK08
NARAYAN ENCLAVE2 BHK4244

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Bihar · Builder registration

ASHIANA BUILDCON PRIVATE LIMITED

CompanyPromoter type
Patna, BiharBased in
---Select---Also RERA-registered in
2Projects
2Cities
2020–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
12 homeson the public record across 2 projects
4,347 sq mbuilt-up filed
1,858 sq mland declared
₹23.54 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from ASHIANA BUILDCON PRIVATE LIMITED— the full portfolio →

03

Location & price analysis

RERA Bihar · Registration filing
District
Patna
City / town
PATNA
Anchal (block)
Patna Sadar
Mauja (revenue village)
Digha
Village
DIGHA
Address
DIGHA
What’s nearby
Schools2 schools within 1km · Library 1.9km away
HealthcareHospital 632m away · Clinic within 2km
Lifestyle1 park within 500m
ShoppingSupermarket 649m away · Mall 1.8km away · Bank 633m away
Getting around
Expressway 4.9 kmPrimary road 108 m · FlyoverRailway line 270 mRailway station 1.9km away (Digha Bridge Halt)Limited bus connectivity nearby
Water & environment
Water body 967 m
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹4.57 Cr declared to build 12 flats. What that works out to:

₹38.08 Lakhdeclared cost per flatall-in — land + construction
₹4,914/sq ftof built-up area₹52,891/sq m
76%of the cost is land₹7,070/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Bihar Registration — Minimum Value Register

In Bihar it’s called the MVR (minimum value register) rate.

₹16,529per sq yd
₹19,768per sq m
Which rate
residential land — the lowest of this village's entries
Matched to
The rate published for the village of “Digha”.
Spread
₹16,529₹21,694 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Bihar’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Bihar · Approved building plan
Building Permit

The promised possession date (1 Oct 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

358 residential projects still under way within 25 km. Step out ring by ring:

3 projects within 1 km — showing the nearest 3.

Patna SadarResidential/Group Housing

UPREM APARTMENT

Srisatya Sai Homes Pvt. Ltd.

Jan 2023registered
Dec 2027target completion
Declared cost₹8.24 CrScale32 flatsAuthorityRERA Bihar
Patna SadarResidential/Group Housing

JAYANT RESIDENCY

LOVELY RANI CONSTRUCTIONS PVT LTD

Jun 2022registered
Apr 2026target completion
Declared cost₹11.00 CrScale20 flatsAuthorityRERA Bihar
DanapurResidential/Group Housing

SHANGRI-LA HOMES

SHANGRI-LA ESTATES PRIVATE LIMITED

Jan 2023registered
Jan 2028target completion
Declared cost₹14.01 CrScale44 flatsAuthorityRERA Bihar

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Bihar does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Bihar does not publish a complaints register. This read cannot speak to them either way.