Detailed Report

NavaDe

T1/OL/016/2022 · K-RERA · https://gethorizon.in/projects/navade-maradu-ernakulam-01tb7esw

01

Complete project overview

K-RERA · Registration filing
Project name
NavaDe
Units
24 units
Mix
9 × 2BHK · 8 × 3BHK · 7 × 1BHK
Booked
19 of 24 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
1,011 sq m
Floor area
3,613 sq m
Description
NavaDe

Timeline

Project startedFeb 2022
RERA registeredFeb 2022
Proposed completionDec 2025
TodaySep 2026
Construction progress

31% overall, as filed

Sanitary Fittings0%
Electrical Fittings0%
Overhead and Underground Water Tanks.0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings30%
Staircases, Lifts Wells60%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

5 of 24 available
TypeArea sq mAvailable
3BHK980 of 4
2BHK640 of 1
1BHK442 of 3
2BHK680 of 3
2BHK832 of 4
2BHK910 of 1
3BHK890 of 3
3BHK1060 of 1
1BHK671 of 4

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.

02

Builder’s track record

K-RERA · Builder registration

ANASVARA PROPERTIES

PartnershipPromoter type
Ernakulam, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2022–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
≈ area only · geocoded, verified but not exact · 9.9397, 76.3261 · © OpenStreetMap contributors
Street
Kanayannur
Village
MARADU
Taluk
Kanayannur
District
Ernakulam
Pincode
682304
Survey no.
Sy No 306/4/2
Patta no.
19244
What’s nearby
Schools1 school within 500m · Library 622m away
HealthcareHospital 425m away · 1 clinic within 1km · Pharmacy within 500m
LifestylePark 1.6km away · Gym or sports centre 1.4km away · 4 restaurants and cafes within 1km
ShoppingSupermarket 50m away · Mall 1.7km away · Convenience store within 500m
Getting around
Expressway 91 m · Kochi - Dhanushkodi RoadPrimary road 1.3 km · Ettumanoor - Ernakulam RoadRailway line 2.1 kmMetro station 1.5km away (Pettah)6 bus stops within 500m
Water & environment
Water body 141 m
distances only — not a flood assessment
04

Government Guidance Rate

Kerala Registration Department — fair value

In Kerala it’s called the fair value.

₹4,806per sq yd
₹5,748per sq m
Which rate
Residential Plot without vehicular access
Matched to
The value published for this project's own survey number, in “Maradu”.

What this number is — and isn’t

  • The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
05

Planning authority

K-RERA · Approved building plan

Maradu Municipality

Municipality
approved 5 Oct 2021 · 4 yrs ago
Building Permit no. E2-BA-263/2019Survey no. Sy No 306/4/2

The promised possession date (1 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan E2-BA-263/2019 on the approving authority’s portal to confirm the approval.

The approving body, at scale

Maradu Municipality

Municipal corporation / municipality

Has approved 21 RERA projects1.4% of Kerala.

an apartments market95% apartments · 5% plotted layouts. Apartments like yours are this body's core business.

Builders
16
On record
1,250 flats · 14 plots
Since
2021

More apartment-heavy than Kerala overall — 95% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by K-RERA

07

Other projects nearby

The register · within 25 km

186 residential projects still under way within 25 km. Step out ring by ring:

10 projects within 1 km — showing the nearest 6.

MARADUResidential (Apartment)

ABAD SIGNATURE

ABAD BUILDERS PVT LTD

Dec 2022registered
Jun 2026target completion
Government Guidance Rate₹10,013/sq ydScale31 flatsAuthorityK-RERA
MARADUResidential (Apartment)

DD HIGHWAY HOMES

DESAI'S DREAM RETREAT PRIVATE LIMITED

May 2023registered
Dec 2027target completion
Government Guidance Rate₹4,856/sq ydScale23 flatsAuthorityK-RERA
MARADUResidential (Apartment)

SKY AT 11

ERA HOMES AND PROJECTS PVT LTD

Oct 2022registered
Dec 2026target completion
Government Guidance Rate₹13,350/sq ydScale18 flatsAuthorityK-RERA
MARADUResidential (Apartment)

VEEGALAND AMORA

VEEGALAND DEVELOPERS PRIVATE LIMITED

Jun 2026registered
Dec 2030target completion
Government Guidance Rate₹10,013/sq ydScale78 flatsAuthorityK-RERA
POONITHURAResidential (Apartment)

SKYLINE OZONE

M/s Skyline Builders

Jul 2022registered
Aug 2027target completion
Government Guidance Rate₹11,920/sq ydScale50 flatsAuthorityK-RERA
POONITHURAResidential (Apartment)

VARMA GARDENIA

VARMA HOMES PRIVATE LIMITED

Aug 2023registered
Nov 2028target completion
Government Guidance Rate₹11,920/sq ydScale28 flatsAuthorityK-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with K-RERA, as the builder submitted it.
  2. 02Builder's track record
    • K-RERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the K-RERA filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the general area only, not the exact site.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • Kerala Registration Department — fair value.
  5. 05Planning authority
    • K-RERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  6. 06Complaints & litigation
    • K-RERA's public record lists no complaints or litigation for this project.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/navade-maradu-ernakulam-01tb7esw.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.