52 of 76 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
4,145 sq m
Floor area
18,446 sq m
Description
Olive Celestina
Timeline
Project startedJun 2013
RERA registeredJul 2021
Proposed completionSep 2021
TodaySep 2026
Construction progress
86% overall, as filed
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings90%
Electrical Fittings90%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
24 of 76 available
TypeArea sq mAvailable
2BHK804 of 10
2BHK824 of 9
3BHK974 of 21
3BHK1207 of 19
Shops and Showrooms7081 of 1
Shops and Showrooms7361 of 1
Penthouse600 of 1
Penthouse1670 of 1
2BHK803 of 11
Shops and Showrooms8490 of 1
Shops and Showrooms8750 of 1
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.
Complete project overview — done
02
Builder’s track record
K-RERA · Builder registration
OLIVE BUILDERS AND DEVELOPERS PVT LTD
CompanyPromoter type
Kottayam, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Schools2 schools within 1km · 4 educational institutions within 1km · College or university 337m away
HealthcareHospital 362m away · Clinic within 2km · Pharmacy within 500m
LifestylePark 1.2km away · Gym or sports centre 651m away · 47+ restaurants and cafes within 1km
ShoppingSupermarket 220m away · Mall 998m away · Convenience store within 1km
Getting around
Expressway 581 m · Seematti RoundaboutPrimary road 213 m · Kottayam - Kumarakom RoadRailway line 1.0 kmRailway station 1.7km away (Kottayam)5 bus stops within 500m
Water & environment
Water body 144 mCanal 478 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Kerala Registration Department — fair value
In Kerala it’s called the fair value.
₹6,181per sq yd
₹7,392per sq m
Which rate
Residential Plot with Corp./Mun./Panch. road access
Matched to
The value published for this project's own survey number, in “Kottayam”.
What this number is — and isn’t
The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
K-RERA · Approved building plan
Kottyam Municipality
Municipality
approved 19 Jan 2012 · 14 yrs ago
Building Permit no. PW3/BA/107/11-12Survey no. 83/15
The promised possession date (30 Sep 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan PW3/BA/107/11-12 on the approving authority’s portal to confirm the approval.
The approving body, at scale
Municipal Corporation / Municipality
A city corporation or municipality that approves building & development permits within its own limits. It has approved 871 RERA projects across 12 districts — about 1 in 2 in Kerala.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
06
Complaints & litigation
K-RERA · public record
Complaints register
Not published. K-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
Cases listed on K-RERA's project page
Listed on K-RERA's project page
5 complaints · 0 disposed · 3 open · 2 with no clear status
Number
Forum
Date
Status
03/2024
K-RERA Authority
2024
Hearingopen
283/2022
K-RERA Authority
2022
Hearingopen
22/2021
K-RERA Adjudicating
2021
not stated
55/2021
K-RERA Adjudicating
2021
Hearingopen
72/2021
K-RERA Adjudicating
2021
not stated
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with K-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
13 residential projects still under way within 25 km. Step out ring by ring:
2 projects within 3 km — showing the nearest 2.
PERUMBAYIKKADUResidential (Apartment)
DD LEGACY HEIGHTS
DESAI HOMES
5 yr
Jul 2022registered
Jul 2027target completion
Government Guidance Rate₹3,864/sq ydScale75 flatsAuthorityK-RERA
The approving body's other projects: counted by Horizon across the register.
06Complaints & litigation
Cases listed on K-RERA's project page: listed on the project's K-RERA page.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/olive-celestina-kottayam-w16tnibf.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.