Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 3.3 km · Outer Ring RoadPrimary road 686 mRailway line 1.0 kmMetro station 828m away (Shivaji Park)Bus stop within 1km
Water & environment
Water body 834 m · Najafgarh NallahRiver 902 m · Sahibi River
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipDeclared fully owned by the promoter
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Location — done
04
Government Guidance Rate
Delhi registration department
In Delhi it’s called the circle rate.
No government guidance rate is shown for this project.
Delhi's circle rate for a flat depends on how many storeys the building has and its plinth area, and this filing states neither.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RERA Delhi · Approved building plan
Building Permit
The promised possession date (25 Aug 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RERA Delhi · public record
Complaints register
Not published. RERA Delhi doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Delhi
Litigation
None declared in this filing
Only what the builder declared, or what RERA Delhi records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Delhi, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
21 residential projects still under way within 25 km. Step out ring by ring:
Of the 24 projects the radar draws within 6 km — every kind, every stage — 3 are residential projects still under way. This list keeps only those, and looks further out.
1 project within 3 km — showing the nearest 1.
2.8 km awayResidential (Building/Tower Development)
ONE Midtown
DLF Urban Private Limited · Central Delhi
PossessionJul 2026Declared cost₹2.71 LakhRegistrationvalid to Jul 2026
No government guidance rate could be matched to this project from Delhi's published schedules.
05Planning authority
RERA Delhi: the approved building plan, as filed.
06Complaints & litigation
RERA Delhi's public record lists no complaints or litigation for this project.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/plot-no-2-road-no-63-punjabi-bagh-west-delhi-tfardx5i.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.