HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
50 units
Mix
28 × 3BHK · 11 × 2BHK · 11 × 1BHK
Buildings
1
Land area
1,810 sq m
Floor area
7,921 sq m
Description
PREETH APARTMENTS

Timeline

Project startedJan 2025
RERA registeredOct 2025
Proposed completionMar 2029
TodayJul 2026
Construction progress

8% overall, as filed

Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings0%
Sanitary Fittings0%
Electrical Fittings0%
Staircases, Lifts Wells0%
Overhead and Underground Water Tanks.0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Slabs of Super Structure2%
Basement(s) and Plinth25%
Excavation99%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

50 of 50 available
TypeArea sq mAvailable
3BHK1074 of 4
2BHK735 of 5
2BHK716 of 6
3BHK11110 of 10
3BHK12110 of 10
1BHK405 of 5
1BHK416 of 6
3BHK1154 of 4

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

THIYYADATH DEVELOPERS PRIVATE LIMITED

CompanyPromoter type
Thrissur, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2025–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Chembukavu
Village
CHEMBUKAVU
Taluk
Thrissur
District
Thrissur
Pincode
680020
Survey no.
328/1-1, 329/1-3
Patta no.
7556
What’s nearby
Schools3 schools within 500m · 9 educational institutions within 1km · College or university 588m away
HealthcareHospital 664m away · 7 clinics within 1km · Pharmacy within 500m
Lifestyle1 park within 500m · Playground within 500m · Gym or sports centre 797m away
ShoppingSupermarket 68m away · Mall 56m away · Convenience store within 500m
Getting around
Expressway 4.2 km · Salem - Kochi - Kanyakumari HighwayPrimary road 120 m · Cheroor RoadRailway line 1.3 kmRailway station 1.3km away (Punkunnam)3 bus stops within 500m
Water & environment
Water body 322 m · Chembukkavu Karthyayani Kshethra Kulam
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Thrissur Municipal Corporation

Municipal Corporation
approved 31 Dec 2024 · 1 yr ago
Building Permit no. BP/17979/2024Survey no. 328/1-1, 329/1-3
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan BP/17979/2024 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Thrissur Municipal Corporation

Municipal corporation / municipality

Has approved 91 RERA projectsabout 1 in 17 in Kerala.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
51
On record
5,515 flats · 15 plots
Since
2021

More apartment-heavy than Kerala overall — 99% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.