Complete project overview

K-RERA · Registration filing
Units
20 units
Mix
18 × Others · 1 × 3BHK · 1 × 4BHK
Booked
12 of 20 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
3,161 sq m
Floor area
9,229 sq m
Description
PRIME MERIDIAN REEF

Timeline

RERA registeredSep 2023
Project startedOct 2023
Proposed completionAug 2028
TodayJul 2026
Construction progress

38% overall, as filed

Sanitary Fittings0%
Completion of terraces floor each building0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
The external plumbing and external plastering15%
Installation of lifts, water pumps etc15%
Fire Fighting Fittings and Equipment15%
Electrical Fittings25%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc25%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings42%
Overhead and Underground Water Tanks.75%
Slabs of Super Structure80%
Staircases, Lifts Wells80%
Excavation100%
Basement(s) and Plinth100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

8 of 20 available
TypeArea sq mAvailable
Others2508 of 18
3BHK2500 of 1
4BHK4340 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

MERITRA HOMES PVT LTD

CompanyPromoter type
Ernakulam, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
6Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
179 homes · 20 plotson the public record across 6 projects
39,134 sq mbuilt-up filed
19,810 sq mplotted area
29,629 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Kochi Municipal CorporationMunicipal Corporationthis project2 of 6 projects
Kalamassery MunicipalityMunicipality1 of 6 projects
Kumbalam PanchayathLocal body (LSGI)1 of 6 projects
Maradu MunicipalityMunicipality1 of 6 projects
Tripunithura MunicipalityMunicipality1 of 6 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Aroor - Thoppumpady Road
Village
EDAKOCHI
Taluk
Kochi
District
Ernakulam
Pincode
682010
Survey no.
1507/6, 1546/4, 200/5-17, 201/1-6
Patta no.
11428P
What’s nearby
SchoolsNearest school 1.5km away · Library 833m away
HealthcareHospital 271m away · 2 clinics within 1km
LifestylePark 2.0km away
ShoppingNo supermarket within 2km
Getting around
Expressway 2.2 kmPrimary road 159 m · Old NH 47Railway line 1.7 kmRailway station 1.8km away (Kumbalam)6 bus stops within 500m
Water & environment
Water body 315 mRiver 835 m · Edakochi Kayal
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Kochi Municipal Corporation

Municipal Corporation
approved 23 Aug 2023 · 2 yrs ago
Building Permit no. SYP/535/12/2017Survey no. 1507/6, 1546/4, 200/5-17, 201/1-6
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan SYP/535/12/2017 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Kochi Municipal Corporation

Municipal corporation / municipality

Has approved 92 RERA projectsabout 1 in 17 in Kerala.

an apartments market97% apartments · 3% plotted layouts. Apartments like yours are this body's core business.

Builders
50
On record
4,090 flats · 12 plots
Since
2021

More apartment-heavy than Kerala overall — 97% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.