This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Project name
Prime Pearl
Units
28 units
Mix
19 × 1 BHK · 6 × 1 RK · 3 × Shop
Carpet area
13–30 sq mper-unit range, as filed
Floors
5
Parking
6 spaces
Land area
380 sq m
Sanctioned built-up
569 sq m
Timeline
RERA registeredJun 2022
Proposed completionDec 2024
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
28 units across 10 batches
TypeArea sq mCount
1 BHK2713
1 BHK282
1 RK173
1 BHK262
1 BHK261
1 BHK301
Shop161
Shop132
1 RK161
1 RK172
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
HealthcareHospital 198m away · 1 clinic within 1km
LifestylePark 1.3km away · Gym or sports centre 709m away
ShoppingSupermarket 1.1km away
Getting around
Expressway 783 mPrimary road 2.1 km · Gharkul RoadRailway line 950 mRailway station 1.8km away (Kalamboli)2 bus stops within 500m
Water & environment
River 512 mWater body 570 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹46,238per sq yd
₹55,300per sq m
Which rate
residential building or flat
Matched to
The rate published for the village of “Dapoli”.
In force
2026-2027 schedule
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
City and Industrial Development Corporation (CIDCO)
Development Authority
Building Permit
Survey no. Plot No 382
The promised possession date (31 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
City and Industrial Development Corporation (CIDCO)
Metropolitan / development authority
Has approved 885 RERA projects — about 1 in 23 in Maharashtra.
an apartments market — 99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.
Builders
724
On record
7,061 flats · 987 plots
Reach
5 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.