HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
515 units
Mix
483 × 3BHK · 31 × 1BHK · 1 × 2BHK
Booked
499 of 515 filed sold/bookedas declared in the RERA filing
Buildings
5
Land area
64,954 sq m
Floor area
58,091 sq m
Description
Provident Winworth Phase 1

Timeline

RERA registeredFeb 2022
Project startedFeb 2022
Proposed completionJun 2026
TodayJul 2026
Construction progress

55% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings0%
Electrical Fittings0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings0%
Electrical Fittings0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings5%
Electrical Fittings5%
Electrical Fittings20%
Installation of lifts, water pumps etc20%
Fire Fighting Fittings and Equipment20%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc20%
Installation of lifts, water pumps etc20%
Fire Fighting Fittings and Equipment20%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc20%
Sanitary Fittings30%
Electrical Fittings30%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings30%
Sanitary Fittings40%
Fire Fighting Fittings and Equipment60%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc60%
Completion of terraces floor each building65%
Installation of lifts, water pumps etc65%
Fire Fighting Fittings and Equipment65%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc65%
The external plumbing and external plastering70%
Completion of terraces floor each building70%
Staircases, Lifts Wells70%
The external plumbing and external plastering80%
Completion of terraces floor each building80%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings85%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings85%
Stilt Floor85%
Slabs of Super Structure85%
The external plumbing and external plastering90%
Completion of terraces floor each building90%
Installation of lifts, water pumps etc90%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings95%
Staircases, Lifts Wells96%
Staircases, Lifts Wells96%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings97%
The external plumbing and external plastering98%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Staircases, Lifts Wells100%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Staircases, Lifts Wells100%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Excavation100%
Basement(s) and Plinth100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

16 of 515 available
TypeArea sq mAvailable
3BHK5915 of 483
1BHK350 of 1
1BHK311 of 18
1BHK210 of 1
2BHK450 of 1
1BHK300 of 11

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

Purva Realities Private Limited

CompanyPromoter type
Ernakulam, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2022–2026Active
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Padivattom NH 47
Village
VAZHAKKALA
Taluk
Kanayannur
District
Ernakulam
Pincode
682024
Survey no.
135/2,3,4,5,6,7,8,12,13,15,16,18,19,20,136/1,3,4,5,6,7,8,9,10,11,12,13,14,15,17,18,19, 137/5,6,8,9,10,11,13,14,16, 138/2,4,8,9,10,11,12,13,14,15,20,21,23,24,25,26, 140/2,9,10,11,13,23, 141/3,15, 159/1
Patta no.
14973,15634,15690,15738,15691,15699,15737,15869
What’s nearby
Schools1 school within 500m · College or university 1.9km away · Library 91m away
HealthcareHospital 834m away · 5 clinics within 1km · Pharmacy within 500m
LifestylePark 1.3km away · Gym or sports centre 449m away · 46+ restaurants and cafes within 1km
ShoppingSupermarket 213m away · Mall 235m away · Bank 167m away
Getting around
Expressway 25 m · Salem - Kochi - Kanyakumari HighwayPrimary road 430 m · Edapally OverbridgeRailway line 759 mMetro station 594m away (Pathadipalam)7 bus stops within 500m
Water & environment
Canal 573 m · Chithrapuzha
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Thirikkakara Municipality

Municipality
approved 14 Dec 2021 · 4 yrs ago
Building Permit no. BA-57/18-19Survey no. 135/2,3,4,5,6,7,8,12,13,15,16,18,19,20,136/1,3,4,5,6,7,8,9,10,11,12,13,14,15,17,18,19, 137/5,6,8,9,10,11,13,14,16, 138/2,4,8,9,10,11,12,13,14,15,20,21,23,24,25,26, 140/2,9,10,11,13,23, 141/3,15, 159/1

The promised possession date (30 Jun 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan BA-57/18-19 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Municipal Corporation / Municipality

A city corporation or municipality that sanctions building & development permits within its own limits. It has approved 871 RERA projects across 12 districts about 1 in 2 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.