29 on filequarterly progress reports filed with RERA
Timeline
RERA registeredJun 2018
Proposed completionDec 2026
TodaySep 2026
Construction progress
20% overall, as filed
Sewerage0%
Storm Water Drains0%
Landscaping And Tree Planting0%
Community Buildings0%
Treatment And Disposal Of Sewerage And Sullage Wat0%
Solid Waste Management And Disposal0%
Water Conservation Rain Water Harvesting0%
Energy Maanagement0%
Fire Protection And Fire Safety Requirements0%
Security Service0%
Water Supply5%
Street Lighting10%
Internal Roads And Footpaths20%
Open Parking20%
Boundary Wall30%
From the builder's latest quarterly progress report filed with RERA Chhattisgarh — % complete overall and per infrastructure work, as of that filing. A dated snapshot, not a live tracker.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
78 units across 2 batches
TypeArea sq mCount
2BHK6354
3BHK8624
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Primary road 225 mRailway line 561 mRailway station 1.8km away (Champa Junction)Limited bus connectivity nearby
Water & environment
Water body 528 mRiver 1.1 km · Hasdeo RiverCanal 2.8 km
distances only — not a flood assessment
Land, title & encumbrance
Mortgage8 unit(s) declared under mortgage to a bank/lender for project finance
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Price analysisdeclared build cost — not a sale price
₹19.32 Cr declared to build 78 flats. What that works out to:
₹24.76 Lakhdeclared cost per flatall-in — land + construction
5%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Chhattisgarh registration department
In Chhattisgarh it’s called the collector guideline rate.
No government guidance rate is shown for this project.
Chhattisgarh's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Complaints & litigation
RERA Chhattisgarh · public record
Complaints, as the builder reports them
None in the builder’s latest quarterly return to RERA Chhattisgarh.
The builder’s own count of grievances it received — not RERA Chhattisgarh’s register, which isn’t published. Cases the builder declares are listed below.
What the builder declared
Declared to RERA Chhattisgarh
Litigation
None declared in this filing
Only what the builder declared, or what RERA Chhattisgarh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Chhattisgarh, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
3 residential projects still under way within 25 km. Step out ring by ring:
Of the 18 projects the radar draws within 6 km — every kind, every stage — 3 are residential projects still under way. This list keeps only those, and looks further out.
1 project between 1 and 3 km — showing the nearest 1.