930 homes · 3,318 plotson the public record across 35 projects
2,23,687 sq mbuilt-up filed
5,65,738 sq mplotted area
12,03,042 sq mland declared
₹542.05 Crdeclared build cost
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Vice Chairman, UDAUrban Development Authoritythis project32 of 35 projects
Director, Town and Country PlanningTown & Country Planning (DTCP)2 of 35 projects
Bellary Urban Development AuthorityUrban Development Authority1 of 35 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Primary road 1.3 km · Anantapur - Tagarakunta RoadNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 3.9 kmRiver 4.7 km · Penna
distances only — not a flood assessment
Government land classification
No residential (House Sites) class on record. The state classes this village’s land as Agricultural Land fit for H.S., Dry land, Land abutting NH/SH/ZPP/MPP. If it’s sold as residential plots, verify the layout’s conversion / approval.
AP Registration & Stamps
Declared external development
Water supply99%
Water99%
Roads65%
Sewage30%
Electricity0%
Solid waste0%
Fire safety0%
Emergency exits0%
Renewable energy0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
Price analysisdeclared build cost — not a sale price
₹2.09 Cr declared to build 66 plots. What that works out to:
₹3.16 Lakhdeclared cost per plotall-in — land + construction
₹236/sq ftof plotted area₹2,538/sq m
79%of the cost is land₹91/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Andhra Pradesh registration department
In Andhra Pradesh it’s called the market value — the registration department's figure, not a sale price.
No government guidance rate is shown for this project.
Andhra Pradesh's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
The promised possession date (13 Apr 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan 1107/0012/LP/AHUDA/2019 on the approving authority’s portal to confirm the approval.
The approving body, at scale
Anantapur
Urban Development Authority
Has approved 51 RERA projects — 0.8% of Andhra Pradesh.
a mixed market — 39% apartments · 61% plotted layouts.
Builders
38
On record
1,140 flats · 5,557 plots
Reach
12 mandals
Since
2018
More layout-heavy than Andhra Pradesh overall — 61% plots here vs 26% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RERA Andhra Pradesh doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Andhra Pradesh
Litigation
None declared in this filing
Only what the builder declared, or what RERA Andhra Pradesh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Andhra Pradesh, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within Ananthapuramu
26 plotted projects still under way within Ananthapuramu. Step out ring by ring:
Of the 1 projects the radar draws within 6 km — every kind, every stage — none is a plotted project still under way. This list keeps only those, and looks further out.