1 extension on record — latest to 31 Aug 2021declared reason: force majeure
Timeline
Construction startAug 2018
RERA registeredDec 2018
Proposed completionAug 2020
TodaySep 2026
Find your plot
Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
36 plots across 24 batches
TypeArea sq mCount
Plot1331
Plot1633
Plot1167
Plot871
Plot741
Plot1001
Plot1311
Plot1241
Plot1201
Plot1151
Plot1101
Plot1041
Plot961
Plot921
Plot1161
Plot454
Plot881
Plot721
Plot731
Plot741
Plot651
Plot762
Plot1271
Plot2371
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SchoolsNo schools within 2km · College or university 995m away
HealthcareHospital 534m away · 1 clinic within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 392 m · Agra Jaipur Bikaner RoadPrimary road 919 m · Bijli Ghar RoadRailway line 2.8 kmRailway station 3.9km away (Noh-Bachhamabi)Bus stop within 1km
Water & environment
Water body 217 m
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹65.00 Lakh declared to build 36 plots. What that works out to:
₹1.81 Lakhdeclared cost per plotall-in — land + construction
₹96/sq ftof plotted area₹1,033/sq m
38%of the cost is land₹37/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
No building detected within ~45 m of the recorded location in any year from 2016 to 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~45 m of the filed location.
Satellite photographs of the same ground
Mar 2017Feb 2023Apr 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
No building is visible in this circle through 2023. That is what the imagery shows, not a statement about the project’s progress.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~45 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Coordinate sits 3-10 km from other projects with the same pincode.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
RAJ-RERA · Approved building plan
Urban Improvement Trust
Urban Improvement Trust
Layout Permitapproved 28 Dec 2018 · 7 yrs ago
The promised possession date (31 Aug 2020) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Urban Improvement Trust
A city-level Urban Improvement Trust — Rajasthan's town-development body in cities without a development authority. It has approved 612 RERA projects across 20 districts — about 1 in 4 in Rajasthan.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
2 plotted projects still under way within 25 km. Step out ring by ring:
Of the 11 projects the radar draws within 6 km — every kind, every stage — 1 is a plotted project still under way. This list keeps only those, and looks further out.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Rajasthan's published schedules.
06Planning authority
RAJ-RERA: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
RAJ-RERA's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/pushp-vihar-bharatpur-hbkpsr8x.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.