HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
64 units
Mix
32 × 3BHK · 32 × 2BHK
Booked
24 of 64 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
2,853 sq m
Floor area
11,520 sq m
Description
QUEENS COURTYARD

Timeline

Project startedJun 2018
RERA registeredMar 2021
Proposed completionJun 2024
TodayJul 2026
Construction progress

30% overall, as filed

The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings2%
Electrical Fittings2%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings10%
Staircases, Lifts Wells54%
Overhead and Underground Water Tanks.54%
Slabs of Super Structure70%
Excavation95%
Basement(s) and Plinth100%
Stilt Floor100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

40 of 64 available
TypeArea sq mAvailable
3BHK9117 of 32
2BHK7723 of 32

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

QUEENS HABITATS PVT LTD

CompanyPromoter type
Kozhikode, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
3Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
138 homes · 14 plotson the public record across 3 projects
25,596 sq mbuilt-up filed
3,995 sq mplotted area
10,419 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Calicut Municipal CorporationMunicipal Corporation1 of 3 projects
Kozhikode Municipal CorporationMunicipal Corporation1 of 3 projects
Peruvayal PanchayathLocal body (LSGI)this project1 of 3 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
KEEZHMAD ROAD
Village
KUTTIKKATTOOR
Taluk
Kozhikode
District
Kozhikode
Pincode
673008
Survey no.
92/1A, 89/7
Patta no.
6344
What’s nearby
Schools1 school within 1km · Library 1.2km away
HealthcareHospital 1.8km away
LifestyleNo parks within 2km · Gym or sports centre 907m away · 4 restaurants and cafes within 1km
ShoppingSupermarket 909m away · Convenience store within 1km
Getting around
Expressway 2.7 km · Kannur-Calicut-Valanchery HighwayPrimary road 2.6 km · Palakottuvayal-Mundikal Thayam RoadNo metro or railway within 5kmBus stop within 500m
Water & environment
River 888 m · Kallai RiverWater body 918 m
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Peruvayal Panchayath

Local body (LSGI)
approved 11 Jun 2018 · 8 yrs ago
Building Permit no. A4-BA(146345)/2018Survey no. 92/1A, 89/7

The promised possession date (30 Jun 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan A4-BA(146345)/2018 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

The local self-government (LSGI)

The local body that sanctioned this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.