8 of 8 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
682 sq m
Floor area
552 sq m
Description
R K RESIDENCY
Timeline
Project startedNov 2019
Proposed completionAug 2021
RERA registeredJun 2025
TodaySep 2026
Construction progress
88% overall, as filed
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
0 of 8 available
TypeArea sq mAvailable
2BHK5340 of 8
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.
Complete project overview — done
02
Builder’s track record
K-RERA · Builder registration
NASAR ABOO
Thrissur, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Schools1 school within 500m · 11 educational institutions within 1km · College or university 1.3km away
HealthcareHospital 101m away · Pharmacy within 500m
LifestyleNo parks within 2km · Gym or sports centre 1.6km away · 39+ restaurants and cafes within 1km
ShoppingSupermarket 253m away · Mall 1.4km away · Convenience store within 1km
Getting around
Expressway 2.2 kmPrimary road 14 m · Guruvayoor - Althara - Ponnani RoadRailway line 1.0 kmRailway station 1.0km away (Guruvayur)Bus stop within 500m
Water & environment
Water body 52 mCanal 442 m · guruvayoor valiya thodu
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Kerala Registration Department — fair value
In Kerala it’s called the fair value.
₹1,104per sq yd
₹1,320per sq m
Which rate
Residential Plot without vehicular access
Matched to
The value published for this project's own survey number, in “Guruvayur”.
What this number is — and isn’t
The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
K-RERA · Approved building plan
Chavakkad Muncipality
Local body (LSGI)
approved 24 Jul 2019 · 7 yrs ago
Building Permit no. E2-BA-25591/2020Survey no. 189
The promised possession date (13 Aug 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan E2-BA-25591/2020 on the approving authority’s portal to confirm the approval.
The approving body, at scale
The local self-government (LSGI)
The local body that approved this project. It has approved 404 RERA projects across 14 districts — about 1 in 4 in Kerala.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
06
Complaints & litigation
K-RERA · public record
Complaints register
Not published. K-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to K-RERA
Litigation
None declared in this filing
Only what the builder declared, or what K-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with K-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
68 residential projects still under way within 25 km. Step out ring by ring:
6 projects within 1 km — showing the nearest 6.
GURUVAYURResidential (Apartment)
AAZIM HOMES
Abdul Rasheed
1 yr 10 mo
Sep 2025registered
Jul 2027target completion
Government Guidance Rate₹2,207/sq ydScale18 flatsAuthorityK-RERA
The approving body's other projects: counted by Horizon across the register.
06Complaints & litigation
K-RERA's public record lists no complaints or litigation for this project.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/r-k-residency-guruvayur-thrissur-ne9gt7jy.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.