1 × Landowner Flatno 104 · 1 × Landowner Flatno 201 · 1 × Landowner Flatno 203 · 1 × Landwner Flatno 303 · 1 × Landowner Flatno 402 · 1 × Landowner Flatno 404 · 1 × Landowner Flatno 501 · 1 × Landowner Flatno 302 · 1 × Flat No 101 · 1 × Flat No 102 · 1 × Flat No 103 · 1 × Flat No 202 · 1 × Flat No 204 · 1 × Flat No 502 · 1 × Flat No 503 · 1 × Flat No 504 · 1 × Flat No 301 · 1 × Flat No 304 · 1 × Flat No 401 · 1 × Flat No 403
Carpet area
42–57 sq mper-unit range, as filed
Floors
6
Parking
23 spaces
Land area
620 sq m
Sanctioned built-up
1,386 sq m
Timeline
RERA registeredJun 2025
Proposed completionDec 2028
TodaySep 2026
Construction progress
Excavation0%
Basement (if any)0%
Podiums0%
Plinth0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Energy managemcnt0%
Fire protection an…0%
Electrical meter r…0%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
20 units across 20 batches
TypeArea sq mCount
Landowner Flatno 104551
Landowner Flatno 201571
Landowner Flatno 203421
Landwner Flatno 303421
Landowner Flatno 402571
Landowner Flatno 404551
Landowner Flatno 501571
Landowner Flatno 302571
Flat No 101571
Flat No 102571
Flat No 103421
Flat No 202571
Flat No 204551
Flat No 502571
Flat No 503421
Flat No 504551
Flat No 301571
Flat No 304551
Flat No 401571
Flat No 403421
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Goleshwar
Taluka
Karad
District
Satara
Pincode
415110
Survey no.
GAT NO 144/1 TO 9/5 PLOT NO 28+29+30
North boundary
PLOT NO 27 AND 31
East boundary
9 M ROAD
South boundary
GAT NO 131 P
West boundary
9 M ROAD
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 2.1km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingSupermarket 1.9km away
Getting around
Expressway 523 m · Tasgaon RoadPrimary road 2.2 kmRailway line 4.6 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
River 1.5 km · KrishnaWater body 1.5 km
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Karad
Building Permit
Survey no. GAT NO 144/1 TO 9/5 PLOT NO 28+29+30
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
The planning authority
The body that approved this project. It has approved 4,607 RERA projects across 33 districts — about 1 in 4 in Maharashtra.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
06
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
Encumbrance
Declared financial encumbrance on the projectworth checking
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
62 residential projects still under way within 25 km. Step out ring by ring:
Of the 130 projects the radar draws within 6 km — every kind, every stage — 48 are residential projects still under way. This list keeps only those, and looks further out.
32 projects between 1 and 3 km — showing the nearest 6.