This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Project name
RED ROSE
Units
12 units
Mix
8 × 2 BHK · 4 × 1 BHK
Carpet area
30–44 sq mper-unit range, as filed
Floors
4
Land area
358 sq m
Sanctioned built-up
429 sq m
Recreational open space
358 sq m
Timeline
RERA registeredDec 2020
Proposed completionJun 2023
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
12 units across 6 batches
TypeArea sq mCount
2 BHK441
2 BHK414
1 BHK302
1 BHK312
2 BHK442
2 BHK441
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Kalambhe
Taluka
Shahapur
District
Thane
Pincode
421601
Survey no.
GUTT 39 B,PLOT NO 85,PLOT NO 81,PLOT NO 84,
North boundary
GUTT NO 39 B PLOT NO 85
East boundary
ROAD TO EAST
South boundary
PLOT NO 81
West boundary
PLOT NO 84
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 204m away · 3 clinics within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km · Bank 503m away
Getting around
Expressway 428 mPrimary road 2.8 kmRailway line 2.0 kmRailway station 2.5km away (Asangaon)Limited bus connectivity nearby
Water & environment
River 470 m · BhairangiCanal 906 m · Bhatsa Right Bank Canal
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹34,281per sq yd
₹41,000per sq m
Which rate
residential building or flat
Matched to
The rate published for the village of “Kalambhe”.
In force
2026-2027 schedule
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
127 residential projects still under way within 25 km. Step out ring by ring:
21 projects within 1 km — showing the nearest 6.
ShahapurOthers
BARADIA EKDANT
BARADIA REALTY
4 yr 11 mo
Aug 2021registered
Jul 2026target completion
Government Guidance Rate₹33,612/sq ydScale93 flatsAuthorityMahaRERA