RERAA KM 102 OF 2021 · RERA Assam · https://gethorizon.in/projects/resort-residencies-kamrup-metro-iwooiztd
Registration lapsed
This project’s RERA Assam registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with RERA Assam before you rely on anything below.
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
RERA Assam · Registration filing
District
KAMRUP METRO
Site address
AZARA AND MIKIRPARA CHAKKARDOI, MOUZA RAMCHARANI, DIST. KAMRUP, ASSAM.
What’s nearby
Schools2 schools within 500m · 11 educational institutions within 1km · College or university 473m away
HealthcareHospital 508m away · 13 clinics within 1km · Pharmacy within 500m
LifestylePark 860m away · Gym or sports centre 535m away · 142+ restaurants and cafes within 1km
ShoppingSupermarket 518m away · Mall 40m away · Convenience store within 500m
Getting around
Primary road 3 m · G.S. RoadRailway line 299 mRailway station 390m away (Guwahati)5 bus stops within 500m
Location — done
04
Government Guidance Rate
Assam registration department
No government guidance rate is shown for this project.
Assam's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RERA Assam · Approved building plan
Building Permit
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RERA Assam · public record
Complaints register
Not published. RERA Assam doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Assam
Litigation
None declared in this filing
Only what the builder declared, or what RERA Assam records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Assam, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
375 residential and mixed-use projects still under way within 25 km. Step out ring by ring: