The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
VARTAKNAGAR
Taluka
Thane
District
Thane
Pincode
400606
Survey no.
212 and 213
North boundary
Proposed 12 M Wide Road
East boundary
Proposed 12 M Wide Road
South boundary
Bldg No 41 and 42
West boundary
Proposed RG Area
What’s nearby
Schools1 school within 1km · Library 1.2km away
HealthcareHospital 85m away · 3 clinics within 1km · Pharmacy within 1km
LifestylePark 951m away · Gym or sports centre 348m away · 3 restaurants and cafes within 1km
Expressway 838 mPrimary road 1.5 km · Lal Bahadur Shastri MargRailway line 1.6 kmMetro station 2.4km away (Teen Hath Naka Station)12 bus stops within 500m
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Thane Municipal Corporation
Municipal Corporation
Building Permit
Survey no. 212 and 213
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Thane Municipal Corporation
Municipal corporation
Has approved 489 RERA projects — 2.4% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
318
On record
7,890 flats · 0 plots
Reach
5 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.