01

Complete project overview

RERA Karnataka · Registration filing
Plots
14 plots
Land parcels
1 survey no

Timeline

Project startedSep 2022
RERA registeredNov 2023
Proposed completionDec 2024
TodaySep 2026

Find your plot

Every plot the builder registered, with the carpet area they filed. Look yours up and check it against what you were shown.

UnitTypeTotal sq m
1Plot168.27
2Plot165.36
3Plot130.79
4Plot92.88
5Plot111.42
6Plot111.42
7Plot148.33
8Plot141.75
9Plot106.31
10Plot148.59
11Plot148.59
12Plot92.87
13Plot75.08
14Plot176.98

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion.

02

Builder’s track record

RERA Karnataka · Builder registration

RUDRAMUNIYAPPA S

ProprietorshipPromoter type
ChitradurgaBased in
1Projects
1City
2023–2024Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Karnataka · Registration filing
Taluk
Tumakuru
District
Tumakuru
Pincode
572103
Address
Sy No. 54/5 Batawadi Village, , Kasaba Hobli North , Tumakuru , Tumakuru, Karnataka - 572103
What’s nearby
SchoolsNo schools within 2km · 3 educational institutions within 1km · College or university 742m away
HealthcareHospital 881m away · 6 clinics within 1km
LifestylePark 1.9km away · 6 restaurants and cafes within 1km
ShoppingSupermarket 963m away · Bank 433m away · ATM within 500m
Getting around
Expressway 64 mPrimary road 300 m · Bengaluru Honnavara RoadRailway line 986 mRailway station 2.7km away (Kyatsandra)Limited bus connectivity nearby
Water & environment
Water body 1.8 km
distances only — not a flood assessment
Land, title & encumbrance
LandOwned by the promoter
ConversionConverted to non-agricultural
MortgageNone declared on the project / land
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Price analysisdeclared build cost — not a sale price

₹8.84 Cr declared to build 14 plots. What that works out to:

₹63.14 Lakhdeclared cost per plotall-in — land + construction
94%of the cost is land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Karnataka Department of Stamps & Registration — 2023-24 guidance-value gazettes

In Karnataka it’s called the guidance value.

₹25,084per sq yd
₹30,000per sq m
Which rate
site (guidance value)
Matched to
The rate published for “Batawadi”.
In force
effective Oct 2023

What this number is — and isn’t

  • The minimum value Karnataka’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Karnataka · Approved building plan

Tumakuru Urban Development Authority

Urban Development Authority
approved 17 Sep 2022 · 4 yrs ago
Layout Permit no. LAO/42/21-22Survey no. 54/5

The promised possession date (31 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan LAO/42/21-22 on the approving authority’s portal to confirm the approval.

The approving body, at scale

Tumakuru Urban Development Authority

Urban Development Authority

Has approved 135 RERA projects1.6% of Karnataka.

a plotted-layout market2% apartments · 98% plotted layouts. Your plotted layout is this body's core business.

Builders
130
On record
0 flats · 5,504 plots
Reach
5 taluks
Since
2017

More layout-heavy than Karnataka overall — 98% plots here vs 38% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by RERA Karnataka

07

Other projects nearby

The register · within 25 km

106 plotted projects still under way within 25 km. Step out ring by ring:

Of the 61 projects the radar draws within 6 km — every kind, every stage — 40 are plotted projects still under way. This list keeps only those, and looks further out.

2 projects within 1 km — showing the nearest 2.

350 m awayPlotted Development

SUBRAMANYA LAYOUT

S RUDRAMUNIYAPPPA · Tumakuru

Jan 2023started
Dec 2026target completion
Declared cost₹4.29 CrScale16 plotsAuthorityRERA Karnataka
880 m awayPlotted Development

DEVARAYAPATNA LAYOUT

RATHNAMMA N S · Tumakuru

Mar 2023started
Dec 2027target completion
Declared cost₹39.08 LakhScale16 plotsAuthorityRERA Karnataka

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.