This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Project name
S R K Corner
Units
11 units
Mix
7 × 2 BHK · 4 × 1 BHK
Carpet area
37–62 sq mper-unit range, as filed
Floors
5
Parking
8 spaces
Land area
527 sq m
Sanctioned built-up
527 sq m
Timeline
RERA registeredMar 2022
Proposed completionDec 2023
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
11 units across 3 batches
TypeArea sq mCount
2 BHK624
2 BHK603
1 BHK374
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
HealthcareHospital 77m away · 3 clinics within 1km · Pharmacy within 500m
LifestylePark 1.4km away · Gym or sports centre 996m away · 7 restaurants and cafes within 1km
ShoppingSupermarket 802m away · Mall 983m away
Getting around
Expressway 1.5 kmPrimary road 1.3 km · Late Manohar Parikar UnderpassRailway line 1.9 km · Mumbai–Pune RailwayMetro station 1.5km away (Phugewadi)5 bus stops within 500m
Water & environment
Water body 890 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹58,863per sq yd
₹70,400per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Pimpale Gurav”.
In force
2026-2027 schedule
Spread
₹35,962 – ₹84,683 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
3,297 residential projects still under way within 25 km. Step out ring by ring:
6 projects within 1 km — showing the nearest 6.
Pimpale GuravResidential / Group Housing
Samrajya Wing GH
Garve Patil Construction Company
4 yr 11 mo
Jan 2025registered
Dec 2029target completion
Government Guidance Rate₹58,863/sq ydScale294 flatsAuthorityMahaRERA