Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
39 units across 7 batches
TypeArea sq mCount
2 BHK6412
1 BHK6412
1 BHK426
1 BHK426
Shop231
Shop241
Shop201
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Deolali (CB)
Taluka
Nashik
District
Nashik
Pincode
422101
Survey no.
248/1 TO 6/5/6
North boundary
9 METER COLONY ROAD
East boundary
PLOT NO 2
South boundary
S NO 248 7
West boundary
60 METER DP ROAD
What’s nearby
SchoolsNearest school 1.6km away
HealthcareHospital 114m away · 2 clinics within 1km
LifestylePark 650m away · Gym or sports centre 1.3km away
ShoppingNo supermarket within 2km · Mall 1.4km away
Getting around
Expressway 1.2 km · Nashik Pune HighwayPrimary road 703 mRailway line 1.5 kmRailway station 2.7km away (Nashik Road)Limited bus connectivity nearby
Water & environment
River 1.5 km · Godavari
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
1,071 residential projects still under way within 25 km. Step out ring by ring:
22 projects within 1 km — showing the nearest 6.
DeolaligaonResidential / Group Housing
SHIVGANGA RESIDENCY
SAI BUILDCON
5 yr
Dec 2022registered
Dec 2027target completion
Government Guidance Rate₹31,948/sq ydScale82 flatsAuthorityMahaRERA