HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
21 units
Mix
11 × 3BHK · 10 × 2BHK
Booked
3 of 21 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
1,215 sq m
Floor area
2,692 sq m
Description
SANKAR ENCLAVE

Timeline

Project startedJun 2014
RERA registeredJan 2025
Proposed completionApr 2028
TodayJul 2026
Construction progress

87% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

18 of 21 available
TypeArea sq mAvailable
2BHK513 of 3
2BHK432 of 3
2BHK563 of 3
2BHK661 of 1
3BHK832 of 3
3BHK733 of 3
3BHK733 of 3
3BHK661 of 2

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

BEENA VALSAN

Thrissur, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2025–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
KENDRA VIDHYALAYAM ROAD
Village
PURANATTUKARA
Taluk
Thrissur
District
Thrissur
Pincode
680551
Survey no.
84/15-1
Patta no.
5923
What’s nearby
Schools1 school within 500m · 8 educational institutions within 1km · College or university 873m away
HealthcareHospital 632m away · Clinic within 2km · Pharmacy within 1km
Lifestyle1 park within 500m · Gym or sports centre 852m away · 9 restaurants and cafes within 1km
ShoppingSupermarket 224m away · Convenience store within 1km · Bank 342m away
Getting around
Primary road 834 m · Thrissur-Kuttipuram roadRailway line 1.6 km · Guruvayur-Thrissur LineRailway station 1.1km away (Amalanagar)2 bus stops within 500m
Water & environment
Water body 658 m
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Adat Grama Panchayat

Grama Panchayat
approved 20 May 2014 · 12 yrs ago
Building Permit no. B1-3171/14Survey no. 84/15-1
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan B1-3171/14 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Adat Grama Panchayat

Grama panchayat

Has approved 6 RERA projects0.4% of Kerala.

a mixed market50% apartments · 50% plotted layouts.

Builders
6
On record
43 flats · 38 plots
Since
2021

More layout-heavy than Kerala overall — 50% plots here vs 19% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.