HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

SAVITRI COMPLEX

P52100012055 · MahaRERA · https://gethorizon.in/projects/savitri-complex-otur-junnar-8rpvcsb6

01

Complete project overview

MahaRERA · Registration filing
Units
45 units
Mix
41 × Flat · 4 × Shop
Carpet area
50–1319 sq mper-unit range, as filed
Floors
7
Parking
1 spaces
Land area
2,200 sq m
Sanctioned built-up
1,778 sq m
Recreational open space
580 sq m

Timeline

RERA registeredSep 2017
Proposed completionDec 2019
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

45 units across 2 batches
TypeArea sq mCount
Shop504
Flat1,31941

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

M/S TRIMURTI DEVELOPERS

PartnershipPromoter type
Pune, MAHARASHTRABased in
1Projects
1City
2017–2019Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 19 nearby projects
1 km radius · coordinates as filed · 19.2032, 73.8743 · © OpenStreetMap contributors
Village
Otur
Taluka
Junnar
District
Pune
Pincode
412409
Survey no.
559/1B/1
North boundary
559 1 B HISSA NO 1
East boundary
OLD OTUR OZAR ROAD
South boundary
559 1 B HISSA NO 2
West boundary
559 1 B HISSA NO 3
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 311m away · 1 clinic within 1km · Pharmacy within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km · Mall 343m away · Bank 496m away
Getting around
Primary road 118 m · Narayangan-Junner-Ozar RoadNo metro or railway within 5kmBus stop within 1km
Water & environment
River 1.1 km · Kukadi
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

56 residential projects still under way within 25 km. Step out ring by ring:

Of the 19 projects the radar draws within 6 km — every kind, every stage — 4 are residential projects still under way. This list keeps only those, and looks further out.

4 projects within 10 km — showing the nearest 4.

210 m awayResidential / Group Housing

Varad Residency

Quality Construction · Otur · Junnar

Jun 2023registered
Mar 2027target completion
Scale42 flatsAuthorityMahaRERA
780 m awayResidential / Group Housing

VIJAYALAXMI SULOJAY

SHREEVIJAYALAXMI DEVELOPERS · Padali · Junnar

Apr 2023registered
Dec 2026target completion
Scale72 flatsAuthorityMahaRERA
890 m awayResidential / Group Housing

Betel Leaf

Vighnaharta Developers · Junnar

May 2024registered
Nov 2027target completion
Government Guidance Rate₹24,106/sq ydScale28 flatsAuthorityMahaRERA
950 m awayResidential / Group Housing

SURYAPRASTHA

SURYAPUTRA DEVELOPERS · Junnar

Jan 2025registered
Dec 2026target completion
Government Guidance Rate₹24,106/sq ydScale40 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  5. 05Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  6. 06Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/savitri-complex-otur-junnar-8rpvcsb6.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.