SHELTER PLAZA

P52000050990 · MahaRERA · https://gethorizon.in/projects/shelter-plaza-birwadi-mahad-le0rsyew

01

Complete project overview

MahaRERA · Registration filing
Units
31 units
Floors
5
Buildings
2
Parking
1 spaces
Land area
700 sq m
Sanctioned built-up
1,398 sq m

Timeline

RERA registeredMay 2023
Proposed completionDec 2026
TodaySep 2026
Construction progress
Basement (if any)0%
Podiums0%
Sewerage (Chamber,…0%
Water conservation…0%
Excavation100%
Plinth100%
Stilt floor100%
Superstructure100%
Internal finishes100%
Flat fit-out100%
Stairs & lifts100%
External finishes100%
OC-readiness100%
Water Supply100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

MAHIRA DEVELOPERS

PartnershipPromoter type
Raigarh, MAHARASHTRABased in
3Projects
1City
2017–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
71 homeson the public record across 3 projects
3,210 sq mbuilt-up filed
2,111 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from MAHIRA DEVELOPERS— the full portfolio →

03

Location

MahaRERA · Registration filing
≈ area only · geocoded, verified but not exact · 18.1049, 73.5035 · © OpenStreetMap contributors
Village
Birwadi
Taluka
Mahad
District
Raigarh
Pincode
402302
Survey no.
SURVEY NO 38/2A/2 AND 38/2A/3 PLOT NO 1 AND 2
North boundary
MAHAD SANDOSHI ROAD
East boundary
INTERNAL COMMON 20 FEET WIDE ROAD
South boundary
LAND IMCOME OF MR VIJAYKANT JAYKRUSHNA CHAUDHARY
West boundary
LAND INCOME OF MR CHANDRAKANT B PAWAR
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 493m away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 1.3 kmPrimary road 161 mNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
River 964 m · Kaal RiverWater body 1.1 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹20,569per sq yd
₹24,600per sq m
Which rate
residential building or flat
Matched to
The rate published for the village of “Birwadi”.
In force
2026-2027 schedule

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Town Planning Raigad Alibagh

Building Permit
Survey no. SURVEY NO 38/2A/2 AND 38/2A/3 PLOT NO 1 AND 2
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

The planning authority

The body that approved this project. It has approved 4,607 RERA projects across 33 districts about 1 in 4 in Maharashtra.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

33 residential projects still under way within 25 km. Step out ring by ring:

3 projects within 3 km — showing the nearest 3.

BirwadiResidential / Group Housing

HARI OM RESIDENCY

APARNA A BHOSALE

Feb 2023registered
Dec 2026target completion
Government Guidance Rate₹20,569/sq ydAuthorityMahaRERA
BirwadiMixed

SHIV SHALINI COMPLEX

GANRAI DEVELOPERS

Mar 2026registered
Dec 2028target completion
Government Guidance Rate₹20,569/sq ydScale82 flatsAuthorityMahaRERA
BirwadiResidential / Group Housing

EKDANT ENCLAVE

SAEE CONSTRUCTIONS AND BUILDERS

Mar 2026registered
Dec 2032target completion
Government Guidance Rate₹20,569/sq ydScale84 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the general area only, not the exact site.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • Maharashtra IGR — Annual Statement of Rates.
  5. 05Planning authority
    • MahaRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  6. 06Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/shelter-plaza-birwadi-mahad-le0rsyew.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.