SHIV ASPIRE

P53100053068 · MahaRERA · https://gethorizon.in/projects/shiv-aspire-sangli-miraj-kupwad-m-2lq6owaw

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
25 units
Floors
5
Buildings
2
Parking
67 spaces
Land area
524 sq m
Sanctioned built-up
1,435 sq m

Timeline

RERA registeredOct 2023
Proposed completionApr 2026
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

VIAN UNITY

PartnershipPromoter type
Sangli, MAHARASHTRABased in
1Projects
1City
2023–2026Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project

Nothing else is on the record within 6 km.

1 km radius · coordinates as filed · 16.9950, 74.7001 · © OpenStreetMap contributors
Village
Sangli Miraj Kupwad (M Corp.)
Taluka
Miraj
District
Sangli
Pincode
416416
Survey no.
CTS NO 5993
North boundary
CTS NO 5994
East boundary
CTS NO 5992
South boundary
GOVT ROAD
West boundary
GOVT ROAD
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 3.2km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 1.9 kmPrimary road 155 mNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 2.7 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Sangli Mirag Kupwad Municipal Corporation

Municipal Corporation
Building Permit
Survey no. CTS NO 5993

The promised possession date (18 Apr 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation

A city municipal corporation that approves projects within its own limits. It has approved 12,653 RERA projects across 34 districts about 1 in 2 in Maharashtra.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

99 residential projects still under way within 25 km. Step out ring by ring:

59 projects between 10 and 20 km — showing the nearest 6.

10.5 km awayResidential / Group Housing

ANANTA

DIGNITY BUILDCON · Tasgaon

Apr 2026registered
Dec 2028target completion
Government Guidance Rate₹21,380/sq ydScale18 flatsAuthorityMahaRERA
11.1 km awayOthers

VISTA MAJESTIC

BAJIRAO BALARAM PATIL AND SHRIKANT VYANKATRAO SHINDE · Tasgaon

Mar 2024registered
Oct 2026target completion
Government Guidance Rate₹21,380/sq ydScale61 flatsAuthorityMahaRERA
11.6 km awayResidential / Group Housing

Skyline Residency

Irfan Abbas Momin · Tasgaon

Jul 2025registered
Apr 2029target completion
Government Guidance Rate₹21,380/sq ydScale36 flatsAuthorityMahaRERA
14.9 km awayResidential / Group Housing

SHANTI SAGAR

SHRAVANI PROPERTIES · Sangli Miraj Kupwad · Miraj

Jan 2026registered
Dec 2028target completion
Scale12 flatsAuthorityMahaRERA
15.5 km awayResidential / Group Housing

MEGH MALHAR RESIDENCY

MALHAR BUILDCON · Sangli Miraj Kupwad · Miraj

Oct 2023registered
Mar 2026target completion
Scale8 flatsAuthorityMahaRERA
16.5 km awayMixed

ARANYA

VERIFEX REALTY LLP · Sangli Miraj Kupwad · Miraj

Sep 2026registered
Aug 2030target completion
Scale32 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  5. 05Planning authority
    • MahaRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  6. 06Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/shiv-aspire-sangli-miraj-kupwad-m-2lq6owaw.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.