HORIZON
Share

SHREE BIJASAN DHAAM

P-DHR-26-6209 · RERA Madhya Pradesh · https://gethorizon.in/projects/shree-bijasan-dhaam-dhar-ahxyn595

01

Complete project overview

RERA Madhya Pradesh · Registration filing
Plots
73 plots
Quarterly reports
3 on file · latest Jul 2025 - Sep 2025quarterly progress certificates filed with RERA

Timeline

Project startedJul 2025
RERA registeredJan 2026
Proposed completionJun 2028
TodaySep 2026
02

Builder’s track record

RERA Madhya Pradesh · Builder registration

GYANESH RATHOD

IndividualPromoter type
1Projects
1City
2026–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Madhya Pradesh · Registration filing
District
Dhar
Tehsil
Dhar
Planning area
Dhar
Address
Survey No. 262/2/3/1/1, 262/2/3/1/2 & 262/2/3/2 at Village Sejwaya, Tehsil & District Dhar. M.P.
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.7km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 1.2 kmPrimary road 3.4 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
River 1.8 km · Chambal RiverWater body 2.0 km · Chambal
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹5.02 Cr declared to build 73 plots. What that works out to:

₹6.88 Lakhdeclared cost per plotall-in — land + construction
44%of the cost is land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

MP Department of Registration & Stamps

In Madhya Pradesh it’s called the collector guideline rate.

₹5,017per sq yd
₹6,000per sq m
Which rate
open plot, residential
Matched to
The rate published for “RAMKARSHAN DHAM (SEJWAYA)”, 890 m from this project.
In force
2026-2027 schedule · effective Apr 2026

Colonies around this project

SEJWAYA ROAD SE ANDAR₹8,400 / sq m₹7,023 / sq yd890 m
MAHESHWARI NAGAR SEJWAYA₹8,000 / sq m₹6,689 / sq yd990 m
NAKODA VIHAR₹9,000 / sq m₹7,525 / sq yd1.1 km
SEJWAYA ROAD PAR₹8,000 / sq m₹6,689 / sq yd1.2 km
SEJWAYA - RADHA KUNJ COLONY ROAD PAR₹7,000 / sq m₹5,853 / sq yd1.2 km

The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.

What this number is — and isn’t

  • The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of colony, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Madhya Pradesh · Approved building plan

Dhar

Town & Country Planning (DTCP)
Layout Permitapproved 23 Jan 2026 · 8 mo ago
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Dhar

Town & Country Planning area · Dhar district

Has approved 24 RERA projects0.5% of Madhya Pradesh.

a plotted-layout market13% apartments · 87% plotted layouts. Your plotted layout is this body's core business.

Builders
22
On record
322 flats · 3,034 plots
Reach
5 tehsils
Since
2017

More layout-heavy than Madhya Pradesh overall — 87% plots here vs 72% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by RERA Madhya Pradesh

07

Other projects nearby

The register · within 25 km

32 plotted projects still under way within 25 km. Step out ring by ring:

Of the 8 projects the radar draws within 6 km — every kind, every stage — 3 are plotted projects still under way. This list keeps only those, and looks further out.

3 projects within 3 km — showing the nearest 3.

980 m awayPlotted Development

NAKODA VIHAR

AASTHA INFRATECH · Dhar

Dec 2023registered
Jul 2026target completion
Declared cost₹3.17 CrScale108 plotsAuthorityRERA Madhya Pradesh
1.7 km awayPlotted Development

SANDHYA ENCLAVE

JAI SHRI RAM REALITY LIMITED · Depalpur

Dec 2025registered
May 2028target completion
Declared cost₹4.81 CrScale5 plotsAuthorityRERA Madhya Pradesh
1.9 km awayPlotted Development

NK CITY

SOLANKI REAL ESTATE · Depalpur

Aug 2025registered
May 2028target completion
Declared cost₹4.89 CrScale64 plotsAuthorityRERA Madhya Pradesh

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Complaints — RERA Madhya Pradesh does not publish a complaints register. This read cannot speak to them either way.