18 on file · latest Jul 2020 - Sep 2020quarterly progress certificates filed with RERA
Timeline
Project startedJan 2020
RERA registeredOct 2021
Proposed completionDec 2022
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
96 units across 2 batches
TypeArea sq mCount
Flats—77
Office—19
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Schools4 schools within 1km · 4 educational institutions within 1km · Library 1.3km away
HealthcareHospital 457m away · 28 clinics within 1km · Pharmacy within 500m
Lifestyle1 park within 500m · Gym or sports centre 902m away
ShoppingNo supermarket within 2km · Convenience store within 500m
Getting around
Expressway 315 m · Ring Road FlyoverPrimary road 3.4 km · Shaheed Tantiya Bhil RoadRailway line 701 m · Mhow IndoreRailway station 1.4km away (Lokmanya Nagar)Limited bus connectivity nearby
Water & environment
Water body 597 mRiver 600 m · Saraswati
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹22.10 Cr declared to build 96 flats. What that works out to:
₹23.02 Lakhdeclared cost per flatall-in — land + construction
50%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
MP Department of Registration & Stamps
In Madhya Pradesh it’s called the collector guideline rate.
₹25,084per sq yd
₹30,000per sq m
Which rate
multi-storey residential
Matched to
The rate published for “ASHTVINAYAK APARTMENT SCHEME 103 / CHAHAT RESIDENCY SCHEME 103 / DEVDARSHAN APARTMENT 103 / SAHAJ RESIDENCY / SCHEME 103 (MUKHYA MARG PAR)”, 160 m from this project.
In force
2026-2027 schedule · effective Apr 2026
Colonies around this project
GOSHALA RAILWAY CROSSING SE A.B. ROAD KO MILANE VALA MAIN ROAD
The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.
What this number is — and isn’t
The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of colony, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RERA Madhya Pradesh · Approved building plan
Indore
Town & Country Planning (DTCP)
Building Permitapproved 7 Oct 2021 · 4 yrs ago
The promised possession date (31 Dec 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Indore
Town & Country Planning area · Indore district
Has approved 1,123 RERA projects — about 1 in 5 in Madhya Pradesh, more than any other body in the state.
a plotted-layout market — 34% apartments · 66% plotted layouts. Apartments like yours are the smaller share here — this body mostly approves plotted layouts.
Builders
776
On record
37,289 flats · 95,164 plots
Reach
10 tehsils
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RERA Madhya Pradesh doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Madhya Pradesh
Litigation
None declared in this filing
Only what the builder declared, or what RERA Madhya Pradesh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Madhya Pradesh, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
110 residential projects still under way within 25 km. Step out ring by ring:
Of the 545 projects the radar draws within 6 km — every kind, every stage — 51 are residential projects still under way. This list keeps only those, and looks further out.
1 project within 1 km — showing the nearest 1.
350 m awayApartment
PREM HARISONS HEIGHTS
HARISONS DEVELOPERS PRIVATE LIMITED · Indore · Juni Indore
RERA Madhya Pradesh: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
06Complaints & litigation
RERA Madhya Pradesh's public record lists no complaints or litigation for this project.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/shree-vinayak-solitaire-juni-indore-tmbweovj.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.