HORIZON
Share

SHRI AUDUMBAR NIWAS CHSL

P51800027164 · MahaRERA · https://gethorizon.in/projects/shri-audumbar-niwas-chsl-andheri-9tkfhxez

01

Complete project overview

MahaRERA · Registration filing
Project name
SHRI AUDUMBAR NIWAS CHSL
Units
30 units
Mix
22 × 2 BHK · 6 × 1 BHK · 2 × 3 BHK
Carpet area
40–76 sq mper-unit range, as filed
Floors
10
Parking
1 spaces
Land area
638 sq m
Sanctioned built-up
1,275 sq m

Timeline

RERA registeredNov 2020
Proposed completionJun 2024
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

30 units across 12 batches
TypeArea sq mCount
1 BHK404
1 BHK401
2 BHK691
1 BHK471
2 BHK541
2 BHK545
2 BHK522
2 BHK591
2 BHK657
2 BHK674
2 BHK721
3 BHK762

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

RAKKHYAN CONSTRUCTION LLP

CompanyPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2020–2024Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400057
Survey no.
F P NO 287
North boundary
F P NO 280
East boundary
D P ROAD
South boundary
F P NO 281-286
West boundary
F P NO 289
What’s nearby
Schools1 school within 500m · 3 educational institutions within 1km · Library 690m away
HealthcareHospital 168m away · 6 clinics within 1km · Pharmacy within 1km
LifestyleNo parks within 2km · Gym or sports centre 1.1km away · 18+ restaurants and cafes within 1km
ShoppingSupermarket 588m away · Convenience store within 1km · Bank 923m away
Getting around
Expressway 1.1 kmPrimary road 241 mRailway line 546 m · Western Railway (Slow)Metro station 576m away (CSMI Airport Domestic T1)14 bus stops within 500m
Water & environment
Canal 1.2 km · LALALA
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

3,821 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,317 projects the radar draws within 6 km — every kind, every stage — 818 are residential projects still under way. This list keeps only those, and looks further out.

72 projects within 1 km — showing the nearest 6.

40 m awayResidential / Group Housing

RAKYAN IMPERIA

RR BRICKCON LLP · Vileparle · Andheri

Nov 2024registered
Sep 2027target completion
Government Guidance Rate₹1,98,530/sq ydScale52 flatsAuthorityMahaRERA
50 m awayResidential / Group Housing

Rudraksha

DVASUYASH CONSTRUCTION LLP · Vile-Parle · CTSO Vile-Parle

Jun 2026registered
Sep 2029target completion
Government Guidance Rate₹1,98,530/sq ydScale22 flatsAuthorityMahaRERA
50 m awayResidential / Group Housing

ASIAN NIRMAL

MANIAR ASIAN INFRA LLP · Vileparle · Andheri

Aug 2024registered
Jun 2028target completion
Scale29 flatsAuthorityMahaRERA
60 m awayResidential / Group Housing

Swaroop Saravana

Matoshree Properties Pvt. Ltd. · Vileparle · Andheri

Mar 2026registered
Nov 2028target completion
Government Guidance Rate₹1,98,530/sq ydAuthorityMahaRERA
70 m awayResidential / Group Housing

SILVER ARCH

SHREYASH MILAN CONSTRUCTION LLP · Vileparle · Andheri

Jan 2026registered
Mar 2028target completion
Scale13 flatsAuthorityMahaRERA
130 m awayResidential / Group Housing

REDEVELOPMENT OF AMARHIND CHSL

PRANAV CONSTRUCTIONS LIMITED · Vileparle · Andheri

Apr 2026registered
Sep 2029target completion
Scale52 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.