Complete project overview

K-RERA · Registration filing
Units
39 units
Mix
20 × 3BHK · 19 × 2BHK
Buildings
1
Land area
1,517 sq m
Floor area
7,038 sq m
Description
SIDDHI MANSION BLUE

Timeline

Project startedNov 2025
RERA registeredFeb 2026
Proposed completionSep 2030
TodayJul 2026
Construction progress

1% overall, as filed

Basement(s) and Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings0%
Sanitary Fittings0%
Electrical Fittings0%
Staircases, Lifts Wells0%
Overhead and Underground Water Tanks.0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation10%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

39 of 39 available
TypeArea sq mAvailable
3BHK9710 of 10
3BHK1101 of 1
3BHK1159 of 9
2BHK769 of 9
2BHK7110 of 10

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

SIDDHI HOMES PROJECTS PVT LTD

CompanyPromoter type
Ernakulam, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
1Projects
1Cities
2026–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
NORTH FORT GATE
Village
NADAMA
Taluk
Kanayannur
District
Ernakulam
Pincode
682301
Survey no.
13/2,13/3,16/2,18/2
Patta no.
10860, 10861
What’s nearby
SchoolsNearest school 1.1km away · College or university 1.2km away · Library 1.1km away
HealthcareHospital 353m away · 1 clinic within 1km · Pharmacy within 500m
LifestylePark 703m away · Gym or sports centre 217m away · 7 restaurants and cafes within 1km
ShoppingSupermarket 167m away · Mall 1.3km away · Bank 99m away
Getting around
Expressway 108 m · Ettumanoor - Ernakulam RoadPrimary road 108 m · Ettumanoor - Ernakulam RoadRailway line 1.1 kmMetro station 73m away (Vadakkekotta)6 bus stops within 500m
Water & environment
Water body 171 mCanal 1.3 km
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Thripunithura Municipality

Municipality
approved 16 Sep 2025 · 10 mo ago
Building Permit no. BP/83950/2025Survey no. 13/2,13/3,16/2,18/2
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan BP/83950/2025 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Thripunithura Municipality

Municipal corporation / municipality

Has approved 6 RERA projects0.4% of Kerala.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
5
On record
295 flats · 0 plots
Since
2021

More apartment-heavy than Kerala overall — 100% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.