Description
SKP Tower

Timeline

Project startedJan 2018
RERA registeredMay 2021
Proposed completionJul 2026
TodayJul 2026
Construction progress

64% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Staircases, Lifts Wells72%
Slabs of Super Structure74%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

33 of 33 available
TypeArea sq mAvailable
3BHK9910 of 10
3BHK881 of 1
2BHK652 of 2
2BHK698 of 8
2BHK598 of 8
2BHK502 of 2
Shops and Showrooms791 of 1
Shops and Showrooms1321 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

Sanjay Kumar Pillai

Ernakulam, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2021–2026Active
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Thevera Kavu Road
Village
NADAMA
Taluk
Kanayannur
District
Ernakulam
Pincode
682301
Survey no.
Resurvey No. 43/ Resurvey Block Number 258 (Old Survey No.974/1)
Patta no.
13525
What’s nearby
SchoolsNo schools within 2km · College or university 1.9km away
HealthcareNearest hospital 2.1km away
LifestyleNo parks within 2km · Gym or sports centre 1.1km away
ShoppingNo supermarket within 2km
Getting around
Expressway 3.8 km · Kochi - Madurai - Dhanushkodi RoadPrimary road 967 m · Main Eastern HighwayNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 275 mRiver 305 m · Thodupuzha RiverCanal 646 m
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Tripunithura Municipal Corporation

Municipal Corporation
approved 23 Feb 2023 · 3 yrs ago
Building Permit no. PW2/BA-473/15-16Survey no. Resurvey No. 43/ Resurvey Block Number 258 (Old Survey No.974/1)

The promised possession date (5 Jul 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan PW2/BA-473/15-16 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Municipal Corporation / Municipality

A city corporation or municipality that sanctions building & development permits within its own limits. It has approved 871 RERA projects across 12 districts about 1 in 2 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.