HORIZON
Share

SOHO NIRMALA

BRERAP00602-2/590/R-349/2019 · RERA Bihar · https://gethorizon.in/projects/soho-nirmala-danapur-patna-mw4au1xf

01

Complete project overview

RERA Bihar · Registration filing
Project name
SOHO NIRMALA
Units
70 units
Unit mix
35 × 2 BHK · 35 × 3 BHK
Parking
70 spaces
Land area
2,066 sq m
Built-up area
20,096 sq m

Timeline

Project startedJan 2016
RERA registeredJan 2019
Proposed completionDec 2020
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

70 units across 2 batches
BuildingTypeArea sq mCount
SOHO NIRMALA2 BHK035
SOHO NIRMALA3 BHK035

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Bihar · Builder registration

SOHO INFRASTRUCTURE PVT LTD

CompanyPromoter type
West Delhi, BiharBased in
---Select---Also RERA-registered in
2Projects
1City
2019–2020Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
90 homeson the public record across 2 projects
37,843 sq mbuilt-up filed
4,711 sq mland declared
₹180.00 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from SOHO INFRASTRUCTURE PVT LTD— the full portfolio →

03

Location & price analysis

RERA Bihar · Registration filing
District
Patna
Anchal (block)
Danapur
Mauja (revenue village)
Vavakkarpur
Address
Plot No. 261, Mauza - Babakkarpur, Danapur, Patna
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.2km away · Clinic within 2km
LifestylePark 1.9km away · Gym or sports centre 1.7km away
ShoppingSupermarket 1.6km away
Getting around
Expressway 1.5 kmPrimary road 1.7 km · Neora RoadRailway line 825 mRailway station 1.9km away (Danapur)Limited bus connectivity nearby
Water & environment
Water body 864 m · chhat puja talabCanal 1.3 km · Barun Canal
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹90.00 Cr declared to build 70 flats. What that works out to:

₹1.29 Crdeclared cost per flatall-in — land + construction
₹4,161/sq ftof built-up area₹44,785/sq m

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Bihar Registration — Minimum Value Register

In Bihar it’s called the MVR (minimum value register) rate.

₹8,264per sq yd
₹9,884per sq m
Which rate
residential land, by road position
Matched to
The rate published for the village of “Babakarpur ( 2% )”.
Highest rate
₹10,331 per sq yd — the top road-facing rate among the residential rates published for this village

By the road it faces

Res. Branch Road₹9,884 / sq m₹8,264 / sq yd
Res. Main Road₹12,355 / sq m₹10,330 / sq yd

The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.

What this number is — and isn’t

  • The minimum value Bihar’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Bihar · Approved building plan
Building Permit

The promised possession date (31 Dec 2020) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

361 residential projects still under way within 25 km. Step out ring by ring:

28 projects within 1 km — showing the nearest 6.

MustfapurMixed Development(residential and commercial)

Laxmi Narayan Complex

OM CONSTRUCTIONS

Sep 2024registered
Jan 2027target completion
Declared cost₹12.98 CrScale1 flatsAuthorityRERA Bihar
PatnaResidential

MAA DURGA APARTMENT

R K HOME

Apr 2024registered
Mar 2027target completion
Declared cost₹13.10 CrAuthorityRERA Bihar
KothwanResidential/Group Housing

Kashyap Green City Phase 2

Kashyap Green Homes Pvt. Ltd.

Apr 2022registered
Mar 2028target completion
Declared cost₹95.26 CrScale295 flatsAuthorityRERA Bihar
PatnaResidential

PUSHPENDRA ENCLAVE

ADITYA MANVI INFRA PRIVATE LIMITED

Jul 2024registered
Nov 2028target completion
Declared cost₹6.07 CrAuthorityRERA Bihar
DanapurResidential/Group Housing

KANAK REGENCY

ARIKA BUILDCON LLP

Nov 2025registered
Jul 2030target completion
Declared cost₹3.62 CrScale16 flatsAuthorityRERA Bihar
DANAPURResidential/Group Housing

MALINI RESIDENCY

KUMAR CONSTRUCTION

Jun 2026registered
Nov 2029target completion
Declared cost₹8.32 CrScale24 flatsAuthorityRERA Bihar

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Bihar does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Bihar does not publish a complaints register. This read cannot speak to them either way.