HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

Sowparnika River View Gardens Phase 2

T1/OL/491/2021 · K-RERA · https://gethorizon.in/projects/sowparnika-river-view-gardens-phase-2-nemom-thiruvananthapuram-unud55h8

01

Complete project overview

K-RERA · Registration filing
Project name
Sowparnika River View Gardens Phase 2
Units
52 units
Mix
28 × 3BHK · 24 × 2BHK
Booked
52 of 52 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
1,537 sq m
Floor area
3,983 sq m
Description
Sowparnika River View Gardens Phase 2

Timeline

Project startedApr 2014
RERA registeredAug 2021
Proposed completionDec 2024
TodaySep 2026
Construction progress

85% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc95%
Excavation100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

0 of 52 available
TypeArea sq mAvailable
3BHK1,4300 of 28
2BHK8520 of 24

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.

02

Builder’s track record

K-RERA · Builder registration

Sowparnika Projects

PartnershipPromoter type
Thiruvananthapuram, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
4Projects
1Cities
2021–2024Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
190 homeson the public record across 4 projects
15,266 sq mbuilt-up filed
5,220 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Trivandrum Municipal CorporationMunicipal Corporation2 of 4 projects
ThiruvananthapuramLocal body (LSGI)1 of 4 projects
Thiruvananthapuram Municipal CorporationMunicipal Corporationthis project1 of 4 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Sowparnika Projects— the full portfolio →

03

Location

K-RERA · Registration filing
≈ area only · geocoded, verified but not exact · 8.4803, 77.0003 · © OpenStreetMap contributors
Street
Thrikkanapuram
Village
NEMOM
Taluk
THIRUVANANTHAPRUAM
District
Thiruvananthapuram
Pincode
695019
Survey no.
677/1-3, 677/1-4
Patta no.
45634
What’s nearby
SchoolsNearest school 1.3km away · Library 2.0km away
HealthcareNearest hospital 2.0km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingSupermarket 1.4km away · Convenience store within 1km
Getting around
Primary road 2.0 km · Thiruvananthapuram - Nagercoil HighwayRailway line 1.7 km · Thiruvananthapuram - Nagercoil JunctionRailway station 3.1km away (Nemom)2 bus stops within 500m
Water & environment
Water body 92 m · Kaithakkonam kulamRiver 527 m · Karamana River
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Government Guidance Rate

Kerala Registration Department — fair value

In Kerala it’s called the fair value.

₹3,973per sq yd
₹4,752per sq m
Which rate
Residential Plot without vehicular access
Matched to
The value published for this project's own survey number, in “Nemam”.

What this number is — and isn’t

  • The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
05

Planning authority

K-RERA · Approved building plan

Thiruvananthapuram Municipal Corporation

Municipal Corporation
approved 18 Jun 2014 · 12 yrs ago
Building Permit no. NEI/BA/175/14Survey no. 677/1-3, 677/1-4

The promised possession date (31 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan NEI/BA/175/14 on the approving authority’s portal to confirm the approval.

The approving body, at scale

Thiruvananthapuram Municipal Corporation

Municipal corporation / municipality

Has approved 224 RERA projectsabout 1 in 7 in Kerala, more than any other body in the state.

an apartments market91% apartments · 9% plotted layouts. Apartments like yours are this body's core business.

Builders
90
On record
12,045 flats · 635 plots
Since
2021

More apartment-heavy than Kerala overall — 91% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by K-RERA

07

Other projects nearby

The register · within 25 km

166 residential projects still under way within 25 km. Step out ring by ring:

3 projects between 1 and 3 km — showing the nearest 3.

THIRUMALAResidential (Apartment)

NAKSHTRA

Chothy's Building Promoters Pvt Ltd

Nov 2025registered
Jul 2030target completion
Government Guidance Rate₹2,759/sq ydScale57 flatsAuthorityK-RERA
THIRUMALAResidential (Apartment)

CORDIAL PARADISE

CORDIAL HOMES PVT LTD

Jun 2022registered
Mar 2027target completion
Government Guidance Rate₹6,622/sq ydScale99 flatsAuthorityK-RERA
THIRUMALAResidential (Apartment)

VARMA DR PAIS LEGACY

VARMA HOMES PRIVATE LIMITED

May 2021registered
Oct 2026target completion
Government Guidance Rate₹4,415/sq ydScale32 flatsAuthorityK-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with K-RERA, as the builder submitted it.
  2. 02Builder's track record
    • K-RERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the K-RERA filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the general area only, not the exact site.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • Kerala Registration Department — fair value.
  5. 05Planning authority
    • K-RERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  6. 06Complaints & litigation
    • Cases listed on K-RERA's project page: listed on the project's K-RERA page.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/sowparnika-river-view-gardens-phase-2-nemom-thiruvananthapuram-unud55h8.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.