This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Project name
SUDARSHAN HEIGHTS
Units
33 units
Mix
17 × Salable Building 1 · 16 × Landowner Building 2
Carpet area
702–780 sq mper-unit range, as filed
Floors
5
Parking
48 spaces
Land area
931 sq m
Sanctioned built-up
1,392 sq m
Timeline
RERA registeredJul 2020
Proposed completionSep 2023
TodaySep 2026
Find your unit
Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.
33 units across 2 batches
TypeArea sq mCount
Salable Building 178017
Landowner Building 270216
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Khopoli
Taluka
Khalapur
District
Raigarh
Pincode
410203
Survey no.
4514
North boundary
ROAD
East boundary
CTS NO 4515 4516
South boundary
MUMBAI PUNE OLD HIGHWAY
West boundary
CTS NO 4516
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 799m away · 2 clinics within 1km
LifestyleNo parks within 2km · 4 restaurants and cafes within 1km
ShoppingSupermarket 1.5km away · Mall 1.2km away
Getting around
Expressway 218 mPrimary road 3.8 kmRailway line 602 mRailway station 1.3km away (Khopoli)Limited bus connectivity nearby
Water & environment
River 506 m · PatalgangaWater body 1.9 km · Vireshwar Lake
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹27,927per sq yd
₹33,400per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Khopoli”.
In force
2026-2027 schedule
Spread
₹22,325 – ₹40,636 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
192 residential projects still under way within 25 km. Step out ring by ring:
8 projects within 1 km — showing the nearest 6.
Chinchvali GoheOthers
SARANGI
ENVISION INFRA
3 yr 11 mo
Apr 2023registered
Mar 2027target completion
Government Guidance Rate₹21,907/sq ydScale103 flatsAuthorityMahaRERA