Detailed Report

Swasti

TN/29/Building/0038/2021 · TNRERA · https://gethorizon.in/projects/swasti-tijp5zqb

01

Complete project overview

TNRERA · Registration filing
Description
Construction of Promoter share of First Floor with One dwelling unit & Second Floor with One dwelling unit consisting of Stilt Floor + 5 Floors with 5 dwelling units at Plot No.784, Door No.‘F’-140, 5th Street, Anna Nagar, Chennai - 600102 comprised in R.S.No.46/2, T.S.No.60, Block No.3 (as per Doc.), Old S.No.46 part, T.S.No.60, Block No.3 (as per Patta) of Periyakudal Village, Greater Chennai Corporation.
Registration no.
TN/29/Building/0038/2021

Timeline

RERA registeredFeb 2021
Proposed completionMay 2023
TodaySep 2026
02

Builder’s track record

TNRERA · Builder registration

Chaitanya Eastlyn

Chaitanya EastlynPromoter
6Projects
1Cities
2018–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
6 projectson the public record across 6 projects

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Chaitanya Eastlyn— the full portfolio →

03

Location

TNRERA · Registration filing
04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

No building detected within ~40 m of the recorded location in any year from 2016 to 2023.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~40 m of the filed location.

Satellite photographs of the same ground

Feb 2017
Mar 2023
Mar 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • No building is visible in this circle through 2023. That is what the imagery shows, not a statement about the project’s progress.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
  • Site is a ~40 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
  • Coordinate could not be cross-checked against nearby filings.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Tamil Nadu registration department

In Tamil Nadu it’s called the guideline value.

No government guidance rate is shown for this project.

Tamil Nadu publishes street-level guideline values; its full schedule isn't in Horizon's record yet.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Planning authority

TNRERA · Approved building plan

CMDA (Chennai Metropolitan Development Authority)

CMDA (Chennai Metropolitan Development Authority)
Planning Permissionapproved 8 Feb 2021 · 5 yrs ago

The promised possession date (31 May 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

CMDA (Chennai Metropolitan Development Authority)

Metropolitan development authority

Has approved 1,914 RERA projectsabout 1 in 2 in Tamil Nadu, more than any other body in the state.

Builders
1,310
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by TNRERA

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — TNRERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — TNRERA does not publish a complaints register. This read cannot speak to them either way.
  • Escrow — TNRERA does not publish escrow declarations. Whether buyer money is ring-fenced cannot be read here.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with TNRERA, as the builder submitted it.
  2. 02Builder's track record
    • TNRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the TNRERA filing.
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • No government guidance rate could be matched to this project from Tamil Nadu's published schedules.
  6. 06Planning authority
    • TNRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  7. 07Complaints & litigation
    • TNRERA's public record lists no complaints or litigation for this project.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/swasti-tijp5zqb.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.