HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

THE GRAND PADMAKSH PHASE 1

P52500022520 · MahaRERA · https://gethorizon.in/projects/the-grand-padmaksh-phase-1-osmanabad-j3udvzyx

01

Complete project overview

MahaRERA · Registration filing
Units
25 units
Mix
14 × 4 BHK · 11 × 3 BHK
Carpet area
108–157 sq mper-unit range, as filed
Floors
50
Buildings
6
Parking
25 spaces
Land area
3,257 sq m
Sanctioned built-up
3,159 sq m

Timeline

RERA registeredSep 2019
Proposed completionMar 2027
TodaySep 2026
Construction progress
Podiums0%
Stilt floor0%
Community Building…11%
Landscaping & Tree…19%
External finishes39%
Internal finishes44%
Treatment And Disp…44%
Water conservation…44%
Flat fit-out46%
Water Supply48%
Stairs & lifts54%
OC-readiness58%
Excavation69%
Basement (if any)69%
Plinth69%
Superstructure69%
Internal Roads & F…100%
Sewerage (Chamber,…100%
Street Lighting100%
Energy managemcnt100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

25 units across 3 batches
TypeArea sq mCount
3 BHK10811
4 BHK1567
4 BHK1577

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

M/S PADMAJA DEVELOPERS

PartnershipPromoter type
Osmanabad, MAHARASHTRABased in
2Projects
1City
2019–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
115 homeson the public record across 2 projects
16,823 sq mbuilt-up filed
5,894 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from M/S PADMAJA DEVELOPERS— the full portfolio →

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 1 new projects last year
  • 8 nearby projects
1 km radius · coordinates as filed · 18.2125, 76.0345 · © OpenStreetMap contributors
Village
Osmanabad
Taluka
Osmanabad
District
Osmanabad
Pincode
413501
Survey no.
27/3190,Survey number 106
North boundary
Future expansion of The Grand Padmaksh
East boundary
9 mtr Internal Road
South boundary
Future expansion of The Grand Padmaksh
West boundary
Land of Mr Pratap Nimbalkar
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 668m away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 960 mPrimary road 2.7 kmRailway line 4.1 kmRailway station 4.1km away (Dharashiv)Limited bus connectivity nearby
Water & environment
Water body 532 mRiver 1.9 km · Bhogavati River
distances only — not a flood assessment
04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

No building detected within ~32 m of the recorded location in any year from 2016 to 2023.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~32 m of the filed location.

Satellite photographs of the same ground

Mar 2017
Jan 2023
Apr 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • No building is visible in this circle through 2023. That is what the imagery shows, not a statement about the project’s progress.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • Site is a ~32 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

07

Other projects nearby

The register · within 25 km

5 residential projects still under way within 25 km. Step out ring by ring:

Of the 8 projects the radar draws within 6 km — every kind, every stage — 3 are residential projects still under way. This list keeps only those, and looks further out.

3 projects within 10 km — showing the nearest 3.

1.6 km awayResidential / Group Housing

DHANESHWAR TOWER

S . P. CONSTRUCTION · Osmanabad

Apr 2024registered
May 2027target completion
Scale24 flatsAuthorityMahaRERA
2.2 km awayResidential / Group Housing

TULJAI TOWER

S P CONSTRUCTION · DHARASHIV

Apr 2026registered
Dec 2027target completion
Government Guidance Rate₹16,029/sq ydScale48 flatsAuthorityMahaRERA
3.6 km awayResidential / Group Housing

DHANESHWAR HEIGHTS

RAMCHANDRA NANABHAU SANGLE · Osmanabad

Mar 2025registered
Jun 2026target completion
Scale24 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  6. 06Complaints & litigation
    • Complaints before MahaRERA.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/the-grand-padmaksh-phase-1-osmanabad-j3udvzyx.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.