HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
56 units
Mix
56 × 3BHK
Booked
32 of 56 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
2,183 sq m
Floor area
10,349 sq m
Description
Tulsi Capitol pointe

Timeline

Project startedNov 2014
Proposed completionDec 2021
RERA registeredJan 2022
TodayJul 2026
Construction progress

88% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

24 of 56 available
TypeArea sq mAvailable
3BHK6,06224 of 56

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

TULSI DEVELOPERS INDIA PRIVATE LIMITED

CompanyPromoter type
Ernakulam, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
4Projects
1Cities
2022–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
128 homeson the public record across 4 projects
25,780 sq mbuilt-up filed
5,581 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Cochin Municipal CorporationMunicipal Corporationthis project1 of 4 projects
Corporation CochinLocal body (LSGI)1 of 4 projects
KalamasseryLocal body (LSGI)1 of 4 projects
Kochi Municipal CorporationMunicipal Corporation1 of 4 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Dhanya South Road
Village
EDAPPALLY SOUTH
Taluk
Kanayannur
District
Ernakulam
Pincode
682028
Survey no.
11/7, 11/6A, 11/6B
Patta no.
44441
What’s nearby
SchoolsNearest school 1.1km away · Library 1.6km away
HealthcareHospital 185m away · 1 clinic within 1km · Pharmacy within 1km
LifestylePark 825m away · Gym or sports centre 643m away
ShoppingSupermarket 334m away · Mall 919m away · Convenience store within 1km
Getting around
Expressway 812 m · Salem - Kochi - Kanyakumari RoadPrimary road 1.5 kmRailway line 804 mMetro station 2.3km away (Elamkulam)Bus stop within 1km
Water & environment
Canal 263 mWater body 456 m
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Cochin Municipal Corporation

Municipal Corporation
approved 19 Jan 2018 · 8 yrs ago
Building Permit no. KRP2/765/2014Survey no. 11/7, 11/6A, 11/6B

The promised possession date (30 Dec 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan KRP2/765/2014 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Cochin Municipal Corporation

Municipal corporation / municipality

Has approved 40 RERA projects2.6% of Kerala.

an apartments market98% apartments · 2% plotted layouts. Apartments like yours are this body's core business.

Builders
24
On record
1,429 flats · 19 plots
Since
2021

More apartment-heavy than Kerala overall — 98% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.