Filed by floor and type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
114 units across 55 batches
BuildingFloorTypeArea sq mCount
113 BHK942
113 BHK951
113 BHK871
123 BHK942
123 BHK951
123 BHK871
133 BHK942
133 BHK951
133 BHK871
143 BHK942
143 BHK951
143 BHK871
153 BHK942
153 BHK951
153 BHK871
163 BHK942
163 BHK951
163 BHK871
173 BHK942
173 BHK951
173 BHK871
183 BHK942
183 BHK951
183 BHK871
193 BHK942
212 BHK641
212 BHK631
212 BHK616
222 BHK641
222 BHK631
222 BHK616
232 BHK641
232 BHK631
232 BHK616
242 BHK641
242 BHK631
242 BHK616
252 BHK641
252 BHK631
252 BHK616
262 BHK641
262 BHK631
262 BHK616
272 BHK641
272 BHK631
272 BHK616
282 BHK641
282 BHK631
282 BHK616
292 BHK641
292 BHK631
292 BHK616
2102 BHK641
2102 BHK631
2102 BHK616
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 48 m · Meerut RoadRailway line 979 mMetro station 258m away (Modinagar South)Limited bus connectivity nearby
Water & environment
Canal 2.0 km · Delhi Merrut expresswayWater body 4.6 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹21.92 Cr declared to build 114 flats. What that works out to:
₹19.23 Lakhdeclared cost per flatall-in — land + construction
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
A building already stood within ~40 m of the recorded location in 2016 — before this project started in 2024. The yearly view ends in 2023, so it does not cover this project's own construction; see the 2026 image.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~40 m of the filed location.
Satellite photographs of the same ground
Mar 2017Mar 2023Mar 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2016.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~40 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Coordinate checked only against its district, not its pincode.
The yearly site view ends in 2023, before this project started in 2024.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Uttar Pradesh registration department
In Uttar Pradesh it’s called the circle rate.
No government guidance rate is shown for this project.
Uttar Pradesh's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
UP-RERA · Approved building plan
Ghaziabad Development Authority
Development Authority
approved 29 May 2023 · 3 yrs ago
Building Permit no. Group Housing/04755/GDA/BP/21-22/0901/11042023
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan Group Housing/04755/GDA/BP/21-22/0901/11042023 on the approving authority’s portal to confirm the approval.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to UP-RERA
Litigation
None declared in this filing
Only what the builder declared, or what UP-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with UP-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
79 residential projects still under way within 25 km. Step out ring by ring:
Of the 6 projects the radar draws within 6 km — every kind, every stage — none is a residential project still under way. This list keeps only those, and looks further out.
45 projects between 10 and 20 km — showing the nearest 6.
10.5 km awayResidential
LANDCRAFT METRO HOMES PHASE-4
RS LANDCRAFT LLP · Modinagar · Ghaziabad
3 yr 10 mo
Sep 2023registered
Jul 2027target completion
⚠ no escrow declaredDeclared cost₹77.28 CrScale273 flatsAuthorityUP-RERA
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Uttar Pradesh's published schedules.
06Planning authority
UP-RERA: the approved building plan, as filed.
07Complaints & litigation
UP-RERA's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/umesh-park-phase-1-modinagar-ghaziabad-kz5i82ih.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.